1979]

UNIVERSITY OF ILLINOIS

463

Funds are available in the Auxiliary Facility System Repair and Replacement Reserve.

Employment of Architect and Engineer for McKinley Health Center Elevator, Urbana

(17) T h e president of the University, with the concurrence of appropriate administrative officers, recommends the employment of Richardson, Severns, Greene, Rishling & Associates, Champaign, to provide the professional architectural and engineering services required in the planning, design, and construction for a project to install an elevator in the McKinley Health Center at the Urbana campus. The firm proposes to undertake the work for a lump sum fee of $24,300 plus reimbursements authorized by the University (estimated to be $2,500). Funds are available from the proceeds of the sale of the University of Illinois Auxiliary Facilities System Revenue Bonds, Series N.

Employment of Architects and Engineers, Capital Development Board Projects, Fiscal Year 1980

(18) The president of the University, with the concurrence of the appropriate administrative officers, recommends that the Board of Trustees request the Capital Development Board to employ architects and engineers for the capital proj'ects for FY 1980 as listed below. The fee for each firm employed will be negotiated by the Capital Development Board in accordance with its procedures.

Chicago Circle FY 1980

Project Project Budget Professional Firm Recommended Space Realignment, Renewal, and Replacement —- Remodeling Lecture Center Roof, Gutter, and $ 350 000 Wiss, Janney, Elstner and AssoDrain Repair—- Phase II ciates, Inc., Chicago 139 000 Stair and Upper Walkway Repair — Phase I 77 900 Art Department Photograph Area _ John Victor Frega Associates, — Rooms 75 300 Ltd., Riverside College of Health, Physical Education, and Recreation 25 400 Biological Science — Science and Engineering Laboratories 42 8001 Computer Center — Science and Engineering Laboratories 225 000 Teng & Associates, Inc., Chicago Modify Air Handling Systems Modify Temperature Control Sys53 500 tems 166 000") University of Illinois will proExterior Masonry Repairs vide the professional services reStack Emission Control 65 000 • quired. CDB will receive bids • University Theatre —• Lighting 279 200 and award construction conand Ticket Booth tracts. Site Improvements Site Improvements Accessibility 152 500 Facilities Design Ltd., Hickory