EXTRACTED TEXT FROM PAGE:



106

Location Natural History Bldg Florida and Lincoln Student Cmpd Meat Science Lab Peabody Drive Svc. Area (Housing) Total

BOARD OF TRUSTEES

[October 20

Space! Amount 58 $ 38 000 210 74 115 000 25 000

_60_ 39 000 402 $217 000 Airport Developmental Reserve 11 500

Access Road from Parking Lot P Southeast to SE End of Hangar # 3 at Willard Airport/ Site Improvement Construction is anticipated in FY 1979 of an access road from Parking Lot P southeast to the southeast end of Hanger # 3 at the University's Willard Airport. T h e road will be 700 feet long and 24 feet wide. T h e project will include a parking lot for 25 spaces, drainage, grading, seeding, signing, and necessary pertinences. T h e surface of the road and parking lot will initially be gravel and after sufficient settling has occurred, an oil and chip surface will be applied. T h e project's estimated cost of $11,500 is to be funded from airport revenue.

Contract for Installation of Supervisory Control System, Chicago Circle Center

(20) The president of the University, with the concurrence of appropriate administrative officers, recommends award of a contract for $156,930 to Hiram Electrical Contractors, Inc., Chicago. T h e firm is the low bidder on the base bid, plus acceptance of deductive alternates No. 1 and No. 2, to furnish all labor, materials, and services to install the second phase of a supervisory control system for mechanical equipment at the Chicago Circle Center, Chicago Circle campus. The low bid is within the estimates developed by the Physical Plant Department. Acceptance of deductive alternates No. 1 and No. 2 (to delete mechanical fan system controls in two areas) was necessary to bring the cost within the funds available. Funds for this work are available from the operations and maintenance line of the FY 1978-79 operating budget of the Chicago Circle Center. It is estimated that the work will be completed by September 1979.

The student advisory vote was: Aye, Miss Kooper, Mr. Sobotka, Mr. Watson; no, none. On motion of Mr. Livingston, this contract was awarded by the following vote: Aye, Mr. Forsydi, Mr. Hahn, Mr. Howard, Mr. Lenz, Mr. Livingston, Mr. Neal, Mrs. Rader, Mrs. Shepherd, Mr. Velasquez; no, none; absent, Governor Thompson.

Construction Contracts, Single Student Residence, Medical Center

(21) T h e president of the University, with the concurrence of appropriate administrative officers, recommends award of the following contracts for construction of the Single Student Residence at the Medical Center campus. T h e award