1937]

UNIVERSITY OF ILLINOIS

20I

For omitting the erection and connection of the cast iron radiators in Surgical Amphitheatre Room No. 412 and delivering to the University of Illinois the cast iron radiators, valves, and traps, deduct the sum of Total Deductions Net Deduction on this Change Order Change Order No. 10 For connecting and disconnecting 47 units of temporary radiation as listed in our letters of January 13 and 22, 1937, a t $6.50 each V. Electrical Contract Change Order No. 7 For furnishing labor and material to install 8th floor outlets shown on drawing No. 9-E which were unintentionally omitted when estimate was submitted covering changes shown on revision drawing No. 56. Credit was allowed for these outlets at the time estimate was submitted. In accordance with proposal dated January 7, 1937, add the sum of Change Order No. 8 For furnishing and installing nine new 500 M.C.M. Cables from the secondary bus in the service vault to the power service breaker on the new switchboard panel in addition to the three 500 M.C.M. cables called for in the specifications, as per proposal dated December 5, 1936, add the sum of Credit for labor to remove the nine present cables is included in this amount. The nine present 500 M.C.M. cables shall remain in place, undisturbed, for emergency service or future additional load. The ends of these present cables shall be left in a neat and secure arrangement and they shall be properly sealed with lead to protect the insulation from moisture. This work shall meet with the approval of the architects or their representative. Note: The Commonwealth Edison Company will not permit the nine present cables to be re-used if they are removed or disturbed. If this work had proceeded at the time the original specifications were written, it would not have been necessary to make this change.

$ 12 00 $104 00 $ 200

305 50

183 08

590 00

Change Order No. 9 For all material and labor required to furnish and install Holophane lighting for Room % 412 in accordance with Holophane Company Drawing No. 6095-MR, complete with all details and ready for operation, add the sum of I 257 For all material and labor required to furnish and install Holophane lighting for Room % 444 in accordance with Holophane Company Drawing No. 6296-M, complete with all details and ready for operation, add the sum of 863 $2 120 Change Order No. 10 Furnish material and labor necessary to run temporary feeder and connect temporarily a duplex vacuum pump in Equipment Room No. 1, add the sum of $ 45

39

59 98

62

On motion of Mrs. Freeman, the resolution ratifying the approval of these change orders was adopted.

LIGHTING FIXTURES FOR MEDICAL A N D DENTAL BUILDING (17) Granger and BoUenbacher, Architects for the Medical and Dental Building, have recently secured bids on lighting fixtures for this building, and the lowest bid was recommended for acceptance with certain minor deductions and the addition of