424

BOARD OF TRUSTEES

[AugUSt 19

Mrs. Evans reported that she had been present at the opening of the bids on August 16, 1927 (See schedules of bids under items 2 to 8 below). MATTERS PRESENTED BY PRESIDENT KINLEY The Board considered the following matters presented by the President of the University. APPROPRIATIONS FOR NEW BUILDINGS (1) I recommend that the funds appropriated by the Fifty-fifth General Assembly for the new buildings for the biennium 1927-29 be appropriated as follows: Third unit of a Library Building and equipment #500,000 Addition to Lincoln Hall and equipment 500,000 Materials Testing Laboratory and equipment 500,000 O n motion of M r s . Evans, this appropriation w a s m a d e , by the following vote: A y e , M r . Armstrong, M r . Barr, M r s . Evans, M r s . Grigsby, D r . Noble, M r . W a r d ; no, none; absent, M r . Blair, M r s . Busey, M r s . Ickes, M r . Small, M r . Trees.

GENERAL CONTRACT FOR THIRD UNIT OF NEW LIBRARY BUILDING

(2) The Supervising Architect submits the following schedule of bids received on August 16 for the general work on the third unit of the Library: SCHEDULE OF BIDS "J" "B" "C" Add for Deduct for Deduct for Bidder Bid Kalman Floor Terrazzo Base Terrazzo Floor $ 817 #1917 #3387 A. W . Stoolman #219887 (Champaign) 1 500 3 000 1000 Murch Bros. Construction. 220 768 700 4000 1 000 Co. (St. Louis) Peterson Colwell, Inc.... 221 900 1 000 4000 2500 (Minneapolis) English Bros 228 822 5000 1000 2700 (Champaign) 1 500 700 2 200 Sowers & Corkery 244 489 (Urbana) 2 000 500 3830 King & Petry 245 298 (Champaign) H. G. Christman Co 248 723 (South Bend, Indiana) He recommends that the contract be awarded to A. W . Stoolman, the lowest responsible and acceptable bidder, at his bid of #219,887, with the option of accepting the proposal to install Kalmanfloorson the basis of an extra of #3,387. I concur in this recommendation. O n motion of M r . Barr, this contract w a s awarded as recommended.

STEEL BOOK STACKS IN THE THIRD UNIT OF NEW LIBRARY BUILDING

(3) The Supervising Architect submits the following schedule of bids received on August 16 for steel book stacks for the third unit of the N e w Library Building: