1995]

UNIVERSITY OF ILLINOIS

315

(The student advisory vote was: Aye, Mr. Didato-Castillo; absent, Mr. Rose.)

Award of Contracts for Bielfeldt Athletic Administration Building, Urbana

(28) The $6.75 million Bielfeldt Athletic Administration Building is a 37,250 gsf administration building which will house the administrative offices and offices for the majority of men's and women's athletic programs, as well as a Hall of Fame. In order for the project to be completed on schedule (January 1996), on May 11, 1995, the Board of Trustees approved a recommendation to delegate authority to the comptroller to award construction contracts to the lowest responsible bidder for bid items within the general division of work provided the total of the bids received did not exceed $1,067,000. On May 11, 1995, bids were received for Bid Group 3. Although the bids received were within the project budget, the total exceeded the amount of the delegated authority by $230,004. In order to award the contracts, it is necessary to receive approval by the Board of Trustees. Accordingly, the president of the University, with the concurrence of the appropriate administrative officers, recommends the award of the following contracts for the Bielfeldt Athletic Administration Building at the Urbana campus. The award in each case is to the lowest responsible bidder on the basis of its base bid. Bid Item #7A — Windows and Curtainwall Bacon 8c Van Buskirk Glass Co., Inc., Champaign Base Bid Item #7B — Drywall and Acoustical Ceiling Treat Brothers Co., Urbana Base Bid Item #7C — Painting and Wallcovering Fox Valley Painting Co., Peoria Base Bid Item #7D — Flooring Tile Specialists, Inc., Champaign Base Bid Item #7E — General English Brothers Co., Champaign Base Total

Bid Bid Bid Bid Bid

$ 367 977 383 510 44 867 104 650 396 000 $1 297 004

Private gift funds for this work are available with the possibility of reimbursement from a subsequent revenue bond sale for the project. A schedule of the bids received has been filed with the secretary of the board for record.

On motion of Ms. Reese, these contracts were awarded by the following vote: Aye, Mrs. Calder, Dr. Gindorf, Mrs. Gravenhorst, Mr. Lamont, Ms. Lopez, Mrs. O'Malley, Ms. Reese; no, none; absent, Dr. Bacon, Governor Edgar, Mr. Engelbrecht. (The student advisory vote was: Aye, Mr. Didato-Castillo; absent, Mr. Rose.)

Supplemental Funding, Molecular Biology Research Facility, Chicago (Contract With Capital Development Board)

(29) The $48 million Molecular Biology Research Facility was designed as a fourstory building to house 106 research laboratories and their support facilities. Bids