426

BOARD OF TRUSTEES

(January 14

Mrs. Gravenhorst, Mr. Lamont, Ms. Lopez, Ms. Reese; no, none; absent, Mrs. Calder, Governor Edgar. (The student advisory vote was: Aye, Ms. Huff, Mr. Riley; no, none.)

Increase in Contracts, Student Services Building, Chicago

(16) On January 19, 1993, the University of Illinois employed an asbestos consultant, Camplin Environmental, Inc., Rosemont, for the Student Services Building project at the Chicago campus, which conducted random sampling of suspected asbestoscontaining materials. The consultant has requested compensation due to the professional services provided by an additional on-site representative, who is required as a result of the asbestos abatement contractor's extra work in employing special techniques to remove cementitious asbestos fireproofing, which was a concealed condition that was discovered after the abatement work began. The cost of the additional services is $65,000. In addition, on July 9, 1993, the University of Illinois approved the award of a contract to Holian Asbestos Removal 8c Encapsulation Corp., Spring Grove, for the asbestos abatement work in the Student Services Building project. The contractor has requested compensation due to additional work in employing special techniques to remove the cementitious asbestos fireproofing, as mentioned above, which was discovered after the abatement work began. The cost of the additional asbestos abatement work is $78,000. Accordingly, the president of the University, with the concurrence of the appropriate administrative officers, recommends that the contracts with Camplin Environmental, Inc., Rosemont, and with Holian Asbestos Removal & Encapsulation Corp., Spring Grove, be increased by $65,000 and $78,000, respectively, for the work described. Funds are available from the proceeds of the Series 1993 Auxiliary Revenue Bond Issue and institutional funds of the Chicago campus.

On motion of Mr. Lamont, this recommendation was approved by the following vote: Aye, Dr. Bacon, Mr. Boyle, Dr. Gindorf, Mr. Grabowski, Mrs. Gravenhorst, Mr. Lamont, Ms. Lopez, Ms. Reese; no, none; absent, Mrs. Calder, Governor Edgar. (The student advisory vote was: Aye, Ms. Huff, Mr. Riley; no, none.)

Increase in Contract, Clinical Sciences North Building, Chicago

(17) On November 13, 1992, the board authorized the employment of the architectural firm of Architrave, Ltd., Chicago, through the construction phase of a project to reconstruct and expand the fourth floor Dialysis Unit in the Clinical Sciences North Building at the Chicago campus. When it was discovered that the planned expansion could not be accommodated in the space initially identified, the architect was requested to revise the floor plan layout several times. The problem was resolved when additional contiguous floor space was acquired. The cost for the additional services is $58,000. Accordingly, the president of the University, with the concurrence of the appropriate administrative officers, recommends that the contract with Architrave, Ltd., Chicago, be increased by $58,000 for the services described. Funds are available from the Hospital Income Fund.

On motion of Mr. Lamont, this recommendation was approved by the following vote: Aye, Dr. Bacon, Mr. Boyle, Dr. Gindorf, Mr. Gra-