318

BOARD OF TRUSTEES

[July 9

The contractors bid on percentages to be added to an estimated volume of material, labor, and subcontractors. Percent for Material Percent for Labor Percent for Subcontracts Total Estimated Fee Payments

Roofing Clark Roofing Company, Broadview 10.0 100.0 5.0 $106 000 Funding will be identified on a project-by-project basis and may include State appropriated, institutional, or restricted funds available in the campus operating budget. It is also recommended that the comptroller be authorized to approve work orders under these contracts. A schedule of the bids received has been filed with the secretary of the board for record. (Note: A proposal from Active Roofing Co., Inc., Hickory Hills, was received in the amount of $41,500 for estimated fee payments. The firm has notified the University of an error in its bid and requested permission to withdraw it since, due to the error, the firm could not fulfill its contractual obligation without suffering economic hardship. Facilities Management, Physical Plant Department, has determined that there is clear and demonstrable evidence that the bidder made a bona fide error in the preparation of the bid, that the error will result in a substantial loss to the bidder, and has recommended that the bidder be allowed to withdraw its bid. The university counsel has stated that, under these circumstances, the University's regulations allow the University to permit the withdrawal.)

On motion of Ms. Reese, this contract was awarded by the following vote: Aye, Dr. Bacon, Mrs. Calder, Dr. Gindorf, Mr. Grabowski, Mrs. Gravenhorst, Mr. Lamont, Ms. Lopez, Ms. Reese; no, none; absent, Mr. Boyle, Governor Edgar. (The student advisory vote was: Aye, Ms. Huff, Mr. Riley; no, none.)

Contract for Asbestos Abatement, Student Services Building, Chicago

(26) The president of the University, with the concurrence of the appropriate administrative officers, recommends the award of a contract for $173,100 to Holian Asbestos Removal & Encapsulation Corp., Spring Grove, the lowest responsible bidder, for asbestos abatement work in the Student Services Building (formerly, the Circle Court Shopping Center) at the Chicago campus. The award is on the basis of its base bid ($79,450) plus acceptance of Alternate 1 ($25,650) and Alternate 2 ($68,000). The project consists of removal of cement-like sprayed-on asbestos-containing materials from underside of concrete pedestrian ramps servicing levels 1 , 2 , and 3; encapsulation or removal of cement-like asbestos-containing materials applied to ceilings in corridors; and removal of asbestos-containing materials floor tile and mastic (adhesive). Funds are available from the proceeds of the Series 1993 Auxiliary Revenue Bond issue. A schedule of the bids received and a description of the alternates have been filed with the secretary of the board for record.

On motion of Ms. Reese, this contract was awarded by the following vote: Aye, Dr. Bacon, Mrs. Calder, Dr. Gindorf, Mr. Grabowski, Mrs.