|
| |
Caption: Board of Trustees Minutes - 1992 This is a reduced-resolution page image for fast online browsing.
EXTRACTED TEXT FROM PAGE:
1993] UNIVERSITY OF ILLINOIS 253 Not to Exceed $317 250 a. Construction Contracts b. Fund Source: Auxiliary Facilities System, Series 1991 Revenue Bond Issue Bids were received on April 1, 1993, for this project. T h e award is made on the basis of the bidder's base bid plus acceptance of the indicated alternate. Construction is to begin in May 1993 and is scheduled for completion by August 1993. Division I — General T h e Petry-Kuhne Co., Champaign Base Bid Alt. G-1 $142 800 14 600 $157 400 Materials Science and Engineering Instructional Laboratories — (This project will renovate approximately 8,000 gsf of the existing building space to house instructional laboratories. Work includes partitions, insulation, acoustical tile ceilings, ceramic and resilient floor tile, rest rooms, elevator and wheelchair lift, plumbing, heating, ventilating, fire protection, electrical, and telecommunication systems.) a. Construction Contracts b. Fund Source: College of Engineering Not to Exceed $581 820 Bids were received on March 19 and 23, 1993, for this project. T h e award is made on the basis of each bidder's base bid plus acceptance of the indicated alternates. Construction is to begin in May 1993 and is scheduled for completion by September 1993. Division I — General W. Commercial Builders, Inc., Base Bid Alt. G-1 . . . . Alt. G-2 . . . . Division II — Plumbing Nogle 8c Black Mechanical, Inc., Base Bid Division III — Heating, Piping, Refrigeration, and Temperature Control Commercial Mechanical, Inc., Dunlap Base Bid Division IV — Ventilation and Air Distribution Viking Plumbing 8c Heating, Inc., Danville Division V — Electrical Witte Electric Company, Champaign 42 871 $133 500 6 500 39 100 $179 100 113 700 Base Bid 59 790 Base Bid Alt. E-2 67 645 2 885 70 530
| |