252

Division I — General McDowell Builders, Inc., Sidell

BOARD OF TRUSTEES

[May 14

Base Alt. Alt. Alt.

Bid G-l G-3 G-4

$364 111 3 498 1 050 3 291 $371 950

Division II — Plumbing and Fire Protection T ' n T Mechanical Contractors, Inc., Urbana Division III — Heating A 8c R Mechanical Contractors, Inc., Urbana Division IV — Ventilation and Air Distribution T ' n T Mechanical Contractors, Inc., Urbana Division V — Electrical Bodine Electric of Decatur, Inc., Champaign

Base Bid

59 417

Base Bid

12 925

Base Bid

6 500

Base Bid Alt. E-3

60 556 510 61 066 $511 858

Total

Memorial Stadium — Phase IA — (The $546,315 project consists of replacement of two skylights and ramp towers and painting of selected structural steel elements.) a. Construction Contracts b. Fund Source: Auxiliary Facilities System, Series 1991 Revenue Bond Issue Not to Exceed $496 650

Bids were received on April 20, 1993, for this project. T h e award is made on the basis of each bidder's base bid plus acceptance of the indicated alternates. Construction is to begin in J u n e 1993 and is scheduled for completion by August 1993. Division I — General English Brothers Company, Champaign

Base Bid Alt. G-2

$349 000 25 700 $374 700

Memorial Stadium — Phase IB — (The $317,520 project is a continuation of the structural modification work undertaken at the completion of Memorial Stadium Phase I. T h e modification consists of the installation of additional bracing to the existing structural steel girder system. In the fall of 1992, three bays on the east side of the Stadium had bracing installed. This project consists of the installation of bracing in the Stadium's fifteen remaining bays and the correction of the height of the rear column connection in the bays completed in the fall of 1992.)