218

B O A R D OF TRUSTEES

[March 26

Contracts, Egress Paths, Allen and Daniels Residence Halls, Urbana

(33) The president of the University, with the concurrence of the appropriate administrative officers, recommends that the following contracts be awarded for egress paths at Allen and Daniels Residence Halls at the Urbana campus. The award in each case is to the lowest responsible bidder on its base bid plus acceptance of the indicated alternates. Division I — General W. Commercial Builders, Inc., Urbana . . . Base Bid Alt. G-l Division V — Electrical Coleman Electrical Service, Inc., Mansfield Total $97 897 661 $ 98 558

Base Bid

22 028 $120 586

The project consists of removing and replacing 64 existing doors, several door frames, and exit lights. Funds are available from the Auxiliary Facilities System Repair and Replacement Fund. A schedule of the bids received and a description of the alternate have been filed with the secretary of the board for record.

On motion of Dr. Bacon, these contracts were awarded by the following vote: Aye, Dr. Bacon, Mr. Boyle, Mrs. Calder, Dr. Gindorf, Mr. Grabowski, Mrs. Gravenhorst, Mr. Lamont, Ms. Lopez, Ms. Reese; no, none; absent, Governor Edgar. (The student advisory vote was: Aye, Mr. Begovich, Mr. Lawless; no, none.)

Contracts, Common Area Improvements, Taft/Van Doren Residence Halls, Urbana

(34) The president of the University, with the concurrence of the appropriate administrative officers, recommends that the following contracts be awarded for common area improvements at the Taft/Van Doren Residence Halls at the Urbana campus. The award in each case is to the lowest responsible bidder on its base bid plus acceptance of the indicated alternates. Division I — General Johnson-Stirewalt, Urbana Base Bid Alt. G-l Alt. G-2 $117 893 1 100 2 082 $121 075 Division II — Plumbing Nogle 8c Black Mechanical, Inc., Urbana Division IV — Ventilation and Air Distribution Nogle 8c Black Mechanical, Inc., Urbana

Base Bid

16 879

Base Bid

27 977