1993]

UNIVERSITY OF ILLINOIS

175

for firing range improvements at the Police Training Institute/Tactical Training Center at the Urbana campus. The award in each case is to the lowest responsible bidder on its base bid plus acceptance of the indicated alternates. Division I — General Work Professional Builders Group, Champaign

Base Alt. Alt. Alt.

Bid #1 #2 #3

$136 000 1 843 11 570 5 200 $154 613

Division II — Mechanical Work T'nT Mechanical Contractors, Inc., Urbana Division V — Electrical Glesco Electric, Inc., Urbana Total

Base Bid Base Bid

22 800 14 052 $191 465

The project consists of the construction of a new 1,800 square foot (12 feet by 150 feet) concrete block, 40-station firing range building with heating/ventilating system at the Police Training Institute/Tactical Training Center located on Curtis Road, approximately one-half mile east of First Street, Champaign. Related site improvements include concrete reinforced containment walls on the outer side of the new north firing range and on the outer side of the existing south range. Funds are available from the restricted funds operating budget of the Police Training Institute. A schedule of the bids received and a description of the alternates have been filed with the secretary of the board for record.

On motion of Mr. Lamont, these contracts were awarded by the following vote: Aye, Dr. Bacon, Mr. Boyle, Mrs. Calder, Dr. Gindorf, Mr. Grabowski, Mr. Lamont, Ms. Lopez, Ms. Reese; no, none; absent, Governor Edgar, Mrs. Gravenhorst. (The student advisory vote was: Aye, Mr. Begovich, Mr. Lawless; no, none.)

Contract, Grainger Engineering Library Information Center, Urbana

(11) The president of the University, with the concurrence of the appropriate administrative officers, recommends award of a construction contract for $346,984.50 to Lincoln Office Supply Company, Inc., Peoria, for carpet and resilient flooring at the Grainger Engineering Library Information Center at the Urbana campus. The award is to the lowest responsible bidder on its base bid plus acceptance of deductive alternate D-l. Funds are available from private gift funds and State capital funds. A schedule of the bids received and a description of the alternate have been filed with the secretary of the board for record.

On motion of Mr. Lamont, this recommendation was approved by the following vote: Aye, Dr. Bacon, Mr. Boyle, Mrs. Calder, Dr. Gindorf, Mr. Grabowski, Mr. Lamont, Ms. Lopez, Ms. Reese; no, none; absent, Governor Edgar, Mrs. Gravenhorst. (The student advisory vote was: Aye, Mr. Begovich, Mr. Lawless; no, none.)