1992]

UNIVERSITY OF ILLINOIS

93

including new partitions, new finishes, laboratory case work and equipment, mechanical and electrical systems, a new loading dock on the east side of the building, and related site work. The project will complete the renovation of the first floor (18,000 gsf) and 77 percent of the ground floor (15,100 gsf); it does not include the Annex.

On motion of Mrs. Shepherd, these contracts were awarded by the following vote: Aye, Mr. Boyle, Mrs. Calder, Mr. Downey, Mr. Grabowski, Mrs. Gravenhorst, Mr. Lamont, Ms. Reese, Mrs. Shepherd; no, none; absent, Dr. Bacon, Governor Edgar. (The student advisory vote was: Aye, Mr. Begovich, Mr. Lawless; no, none.)

Contracts, Bioacoustics Research Laboratory, Beckman Institute, Urbana

(12) The president of the University, with the concurrence of the appropriate administrative officers, recommends the award of the following contracts for the construction of a 7,000 square foot Bioacoustics Research Laboratory in Beckman Institute at the Urbana campus. The award in each case is to the lowest responsible bidder on its base bid plus acceptance of the indicated alternate. Division I — General Barber 8c DeAtley, Inc. Urbana

Base Bid Alt. G-l

$164 400 7 526 $171 926

Division II — Plumbing A 8c R Mechanical Contractors, Inc., Urbana Division III — Heating, Refrigeration, and Temperature Control Commercial Mechanical, Inc., Dunlap Division TV — Ventilation and Air Distribution Nogle 8c Black Mechanical, Inc., Urbana Division V — Electrical Remco Electrical Corporation, Champaign Division VI — Fire Protection F. J. Murphy 8c Son, Inc., Springfield Total

Base Bid

127 400

Base Bid

70 000

Base Bid

82 315

Base Bid

88 700

Base Bid

7 ?>80 $548 221

It is further recommended that the contracts, other than the contract for general work, be assigned to the contractor for general work. It is also recommended that the project architect, Ralph Hahn and Associates, Inc., Springfield, be employed for the architectural/engineering contract administrative services required during the construction phase of the project on a fixed-fee basis of $8,208; and to provide the required on-site observation on an hourly basis, estimated at $8,500, plus authorized reimbursements estimated to be $2,700.