1900.]

PROCEEDINGS OF T H E BOARD OF TRUSTEES

279

A summary of the above statements'will show that there has been allowed for

Completed workOn general contract H e a t i n g (pipe s u p p o r t s , etc.) , P l u m b i n g and sewers Tunnel Material on the groundGeneral contract , Plumbing Total completed work and material on t h e g r o u n d . On which certificates h a v e been issued to t h e a m o u n t . L e a v i n g 15 p e r cent retained , $17,888 303 720 2.812 86 00 40 53

$21,754 79 $15,454 75 3,813 66 $19,268 41 $41,023 20 $34,869 72 $6,153 48

The following changes in contract have been made in the form of additions:

F o r extra d e p t h of foundation owing to quick-sand., Authorized changes in B building Total. To offset this t h e r e is a credit on account of change in cement for brick walls of | b a s e m e n t for $65 75 352 75 $418 50 $285 00

This was allowed as you know because of scarcity in the brands specified and to avoid delay:

T h e r e will also be a credit on t h e t u n n e l which is n o t adjusted of a b o u t . And on steam pipes, etc., in t u n n e l of about Or a total reduction approximating $500 00 500 00 1,275 00

Notice of these changes has been given to the Surety Company.

:

i

Respectfully submitted,

J . C. LLEWELLYN.

C H A N G E S AND I M P R O V E M E N T S .

T h e C o m m i t t e e on B u i l d i n g s a n d G r o u n d s m a d e t h e following r e port, which was a p p r o v e d for record:

URBANA, ILLINOIS, March 12,1900.

To the Board of Trustees. Your Committee on Buildings and Grounds makes this report concerning matters referred to it to be performed during the last summer vacation and subsequently. Much of the work was not fully completed until this fall, and so your Committee has delayed its report until this time. The roof of the Gymnasium was fixed by putting a composition roof over the old tin roof. This roof cost $4.25 per square and is the best of its kind that is made. It has proved very satisfactory. A coat of asbestos paint was put on the roof of the Armory. The roof is now in good condition and will last for some time.longer, if decay from the under side of the tin does not develop rapidly.