278

UNIVERSITY, OF I L L I N O I S .

[April 18,

Since my statement to you December 11, 1899, work has been carried forward as rapidly as the weather permitted, the work being done with the temperature below twenty degrees. Bad weather interfered with the work very much during February. At the present time the walls of D and C buildings are well advanced and workmen are setting the cornice on D. The walls of A building are up to the level of the window sills or top of stone die course. The cut stone work, with the exception of the ashlars of areas, is practically complete. Material is on the ground and with good weather, work should move rapidly from this time on. , Below I hand you statements on which the last certificates were based:

GENERAL CONTRACT. Completed work— Excavation, 3,350 cubic y a r d s at 20 cents a yard Common brick in cement, 432,600 at $11,00. Common brick in lime, 335,000 at $10.00. Concrete footings, 7,850 cubic feet at 20 cents Cement plaster on walls, 8,650 s q u a r e feet at 2 c e n t s . . . Cut stone set, 3,970 cubic feet at $1.25. Face brick laid, 69,500 at $18.00. F r a m i n g lumber erected, 11,170 feet at $28.00 F r a m i n g lumber erected, 18,300 feet at $26.00 Flooring laid, 25,700 feet at $26.00 ; T e r r a cotta... Total................. ....

$67 00 4,758 6> 3,350 00 1,570 00 173 00 4,962 50 1,251 00 312 76 475 80 668 20 300 00 $17,888 86 $1,693 75 1,014 00 165 00 540 00 330 00 648 00 1,750 00 324 00 1,500 00 5,680 00 700 00 1,110 00 2,842 53 $18,297 28

Material stored on aroundCommon brick, 271,000at $6.25 Face brick, 78,000 at $13.00... P r e s s e d brick, 11,000at $ 1 5 . 0 0 . . . . . . . . . . . . . . . . ; E n a m e l e d brick, 9,000 at $60.00 Cut stone, 300 cubic feet at $1.10 F r a m i n g timber. 2 inch stuff, 36,000 feet at $18.00.. F r a m i n g t i m b e r (heart). 87,500 feet at $20.00 , F r a m i n g timber, 18,000 feet at $18.00 Cast iron—part erected—60,000 p o u n d s at 2*2 cents W r o u g h t iron—part erected—142,000 p o u n d s at 4 cents S h e a t h i n g , 78 inch M.'W. pine, 35,000 feet at $30.00 , Mill work frames, 370 at $3.00. T u n n e l as per former estimate

Completed work and material on g r o u n d s .

PLUMBING.

$36,186 14

Completed w o r k as per s t a t e m e n t of J a n u a r y 3rd. . . . . . . . Pipe, i t c , delivered as per s t a t e m e n t of J a n u a r y 3rd, . F r e i g h t and cartage. Pipe fittings, etc., as per invoice of same

$720 3,386 103 324

40 03 37 26

$4,534 0G HEATING.

Thirty-two cold air boxes and faces . Seventy-five pipe r e s t s , etc., $3.08....

$72 00 231 00

$303 00