|
| |
Caption: Book - Building Program 1934-1942 This is a reduced-resolution page image for fast online browsing.
EXTRACTED TEXT FROM PAGE:
10 'Wm WILLIAM LAMONT ABBOTT POWER PLANT With GEOLOGICAL SURVEY LABORATORY at right (Champaign) This plant provides light, heat, a n d power for all buildings at UrbanaChampaign. Built with State funds only. Completed in 1940 at a cost of $1,685,934, including tunnels, conduits, a n d mains. See p a g e 3 2 .
| |