Caption: Board of Trustees Minutes - 1968 This is a reduced-resolution page image for fast online browsing.
EXTRACTED TEXT FROM PAGE:
Table I I . Chicago Circle Campus — 1969-71 Capital Projects Net Assignable Square Feet (NASF) 68 45 94 8 120 69 27 55 (490 931 709 723 590 227 836 445 120 581) Total Cost $ 7 411 500 4 470 500 9 873 500 643 500 16 10 2 5 ($57 1 4 707 353 413 667 540 714 110 100 400 500 600 600) 000 000 $ Anticipated Non-State Funds 250 000* 106 OOO3 1 0 0 0 000' -0Stale Funds $ 7 161 500 4 364 500 8 873 500 643 500 15 9 2 5 ($54 1 4 707 353 313 667 084 714 110 100 400 500 600 600) 000 000 Building Efficiency1 60% 60% 70% 72% 60% 60% 60% 60% 1. 2. 3. 4. 5. 6. 7. 8. 9. ., . Project Buildings 2 Architecture and Art Addition Classroom-Office Building Library Addition Plant Research Laboratory Science and Engineering, South Addition a. Engineering b. LAS-Sciences c. Classroom-Study Space Student Services Building Subtotal, Buildings Power Plant Addition Land Acquisition Movable Equipment 1967-69 Buildings 1969-71 Buildings Conversion to color TV Planning 1971-73 Remodeling and Building Improvement Protection of Life and Property Site Improvements Utilities Distribution System Total 1 8 1 000 000 1 1 000 000 1 100 OOO3 -0($3 456 000) -0-0-0-0-0-0-0-0-0-0$3 456 000 490 581 3 270 188 5 185 181 305 430 1 685 000 3 850 150 573 900 1 4 8 7 500 1 152 800 $80 874 749 3 270 188 5 185 181 305 430 1 685 000 3 850 150 573 900 1 4 8 7 500 1 152 800 $77 418 749 The term "building efficiency" refers to the ratio of "net assignable square feet" to "gross square feet" in a building. In alphabetical order; not in priority order. Six of these buildings were requested for the 1967-69 biennium. ' Higher Education Facilities Act, Title I. 4 Higher Education Facilities Act, Title I and Title I I .
|