Caption: Board of Trustees Minutes - 1984 This is a reduced-resolution page image for fast online browsing.
EXTRACTED TEXT FROM PAGE:
00 o Cycle IV Energy Conservation Grant Awards Campus/Project Chicago Install Reverse Osmosis Deionization System —Science and Engineering Lab Automatic Light Dimming System — Library Fan Volume Reductions — Art and Arch Install Modular Chillers, Night Temp. Setback, and Modular High Efficiency Boilers — Peoria St. Building Install Reverse Osmosis Deionization System — Med. Sci. Addn Fan Volume Reduction and Install Supplemental Air Handling System •— Dentistry Modify Chilled Water and H V A C Systems — Rockford School of Medicine Subtotal Urbana-Champaign Remodel Temp. Control — Animal Sci. Lab Remodel Temp. Control and Domestic Hot Water System — Morrill Hall Subtotal Grand Total Total Cost Federal Share Nonfederal Share CDB Funds Campus Funds' $ 115 772 146 960 62 982 144 787 155 756 120 740 O | ° g J g u> S g 120 432 $ ( 8 6 7 429) $ 65 626 $433 714 $335 655 $ 9 8 060 137 880 $ ( 2 0 3 506) $ 1 0 7 0 935 $101753 $535 467 $ 4 2 500 $378 155 $ 5 9 253 $157 313 O «• 1 Represents $138,890 in "in-kind" engineering services credits plus $18,423 in campus institutional funds as allocated by the Board of Trustees to the campus physical plant budgets. cr ro ft >-l
|