|
| |
Caption: Board of Trustees Minutes - 1984 This is a reduced-resolution page image for fast online browsing.
EXTRACTED TEXT FROM PAGE:
1983] UNIVERSITY OF ILLINOIS 183 On motion of Mrs. Day, this contract was awarded by the following vote: Aye, Mrs. Day, Dr. Donoghue, Mr. Forsyth, Mr. Howard, Mr. Logan, Mr. Madden, Mrs. Shepherd, Mr. Stone; no, none; absent, Mr. Hahn, Governor Thompson. (The student advisory vote was: Aye, Mr. Bandala, Mr. Cobb, Miss Forsyth; no, none.) Award of Contract, Heat-Recovery System, Biological Resource; Laboratory, Chicago (22) On October 15, 1981, the Board of Trustees accepted a Federal grant of $1,456,933 under the Federal Institutional Buildings Grants program, a part of the National Energy Conservation Policy Act. Bids have now been received for the construction of one of the conservation projects authorized under the third cycle of that program. Accordingly, the president of the University, with the concurrence of the appropriate administrative officers, recommends the award of a contract for $80,976 to the Nu-Way Contracting Corp., Chicago, the low bidder on its base bid, for the installation of a heat-recovery retrofit system to increase the energy efficiency of the ventilation system of the Biological Resources Laboratory, Health Sciences Center, Chicago campus. Funds are available from the grant. A schedule of the bids received has been filed with the secretary of the board for record. On motion of Mrs. Day, this contract was awarded by the following vote: Aye, Mrs. Day, Dr. Donoghue, Mr. Forsyth, Mr. Howard, Mr. Logan, Mr. Madden, Mrs. Shepherd, Mr. Stone; no, none; absent, Mr. Hahn, Governor Thompson. (The student advisory vote was: Aye, Mr. Bandala, Mr. Cobb, Miss Forsyth; no, none.) Contracts for Renovation, Terrace, lllini Union, Urbana (23) T h e president of the University, with the concurrence of the appropriate administrative officers, recommends award of the following contracts for renovation of the lllini Union Terrace at the Urbana-Champaign campus, the award in each case being to the low bidder on its base bid. This work will restore the terrace to a watertight condition, eliminating leakage into the lower level of the Union. i Deterioration of the 21-year-old flagstone deck of the terrace has resulted in leakage into the bowling alley directly below. T h e project consists of the removal of the existing surface and installation of new drains, a new waterproofing system, new insulation, precast concrete exposed aggregate pavers, and miscellaneous masonry work. Additive General Base Bid Alternate Total Felmley-Dickerson Company, Urbana $58 000 $ 1 0 0 0 $59 000 p, ,. (Alt. G - l ) v rlumbing ' R. H. Bishop Company, Champaign 7 565 N/A 7 565 Waterproofing Hitchens Roofing Company, Inc., Urbana 26 000 N/A 26 000 Total $92 565 Alternate G-l provides that all contracts other than the contract for general work be assigned to the general contractor. It is further recommended that an
| |