|
| |
Caption: Board of Trustees Minutes - 1994 This is a reduced-resolution page image for fast online browsing.
EXTRACTED TEXT FROM PAGE:
232 BOARD OF TRUSTEES [March 9 eling of restrooms in the Lincoln Avenue Residence Hall at the Urbana campus. The award in each case is to the lowest responsible bidder on its base bid plus acceptance of the indicated alternates:1 Division I — General W. Commercial Builders, Inc., Base Bid Alt. #G-1 Alt. #G-5 Alt. #G-6 Division II — Plumbing Hart & Schroeder Mechanical Contractors, Inc., Champaign $248 6 54 12 000 288 000 000 $320 288 Base Bid Alt. #P-5 142 360 18 420 160 780 Division V — Electrical Central Illinois Electric, Pesotum Total Base Bid. 48 800 48 800 $529 868 The remodeling will upgrade 16 student bathrooms and two public restrooms. The remodeling is necessary to meet electrical codes, improve appearance, and make public restrooms compliant with the Americans with Disabilities Act. The upgrade will include new ceilings and lighting, replace stall partitions and doors, upgrade showers, and add electrical receptacles. Funds are available from the Fiscal Year 1995 Auxiliary Facilities System R&R Funds and from Housing Division Funds with reimbursement from the FY 1996 Auxiliary Facilities System R&R Funds. A schedule of the bids received has been filed with the secretary of the board for record. On motion of Dr. Gindorf, these contracts were awarded by the following vote: Aye, Mr. Engelbrecht, Dr. Gindorf, Mrs. Gravenhorst, Mr. Lamont, Ms. Lopez, Mrs. O'Malley, Ms. Reese; no, none; absent, Dr. Bacon, Mrs. Calder, Governor Edgar. (The student advisory vote was: Aye, Mr. Didato-Castillo, Mr. Rose; no, none.) Employment of Architect/Engineer, Basement Remodeling, Gregory Drive Residence Hall, Urbana (18) The president of the University, with the concurrence of the appropriate administrative officers, recommends the employment of BLDD Architects, Inc., Decatur, for the professional services required through the construction phase of the basement remodeling project in the Gregory Drive Residence Hall at the Urbana campus. The firm's fee through the construction phase will be a fixed fee of $85,000, including reimbursable expenses. The $1.0 million project will remodel approximately 14,000 gsf in the basement of the Gregory Drive Residence Hall Food Service Building to include a computer room, library, exercise room, music practice room, conference room, study area, and 1 Description ofAlternates: Alt. #1 — Assignment fee; Alt. #5 — Remove marble shelf, provide Corian top and under-mount type oval bowl; Alt. #6 — In 16 student bathrooms, remove and replace the mirror on the wall opposite the lavatories.
| |