initial phase of the project to restore the Huff, Freer, and First Street tennis courts and to construct three additional courts at Dorner Drive at the Urbana campus. The award in each case is to the lowest responsible bidder on its base bid plus acceptance of the alternates indicated. Division I — General Cross Construction, Urbana Base Bid Alt. G-l Alt. G-2 $504 000 00 12 632 30 4 500 00 $521 132 30 Division II — Electrical Bodine Electric, Decatur Base Bid Alt. E-l $ 72 953 00 53 370 00

126 323 00 Total $647 455 30 It is further recommended that the contract for electrical work be assigned to the contractor for general work. Funds are available from the proceeds of the Auxiliary Facilities System, Series 1991 Revenue Bond issue. A schedule of the bids received and a description of the alternates have been filed with the secretary of the board for record. The project consists of the construction of new playing surfaces and auxiliary structures upon 26 of the University's tennis courts (at four separate locations) including placement of various base and surface materials, new acrylic playing surfaces, fencing, drainage systems, and auxiliary site work, as well as providing some new lighting. The project also includes the construction of three new courts at Dorner Drive.

On motion of Ms. Reese, these contracts were awarded by the following vote: Aye, Dr. Bacon, Mr. Boyle, Mrs. Calder, Mr. Downey, Mrs. Gravenhorst, Mr. Lamont, Ms. Reese, Mrs. Shepherd; no, none; absent, Mr. Grabowski. (Governor Edgar asked to be recorded as not voting on this item.) (The student advisory vote was: Aye, Ms. Caporusso, Mr. Mitchell; no, none.)

Increase in Project Budget; and Award of Contracts, Assembly Hall Parking Lot Renovation, Urbana

(18) The original $1.5 million Assembly Hall parking lot renovation project consisted of the first phase of a project to restore the parking lots. The first phase included two of the four quadrants. Due to a favorable bidding climate and economies associated with completion of the entire project at one time, the bid documents were structured to include all four quadrants. Accordingly, the president of the University, with the concurrence of the appropriate administrative officers, recommends the increase of the project budget to $1.97 million and award of the following contracts for the renovation of the Assembly Hall parking lots at the Urbana campus. The award in each case is to the lowest responsible bidder on its base bid plus acceptance of the alternates indicated.