EXTRACTED TEXT FROM PAGE:



520

BOARD OF TRUSTEES

[April 9

absent, Mr. Grabowski. (Governor Edgar asked to be recorded as not voting on this item.) (The student advisory vote was: Aye, Ms. Caporusso, Mr. Mitchell; no, none.)

Contracts, Common Area Improvements, Illinois Street Residence Halls, Urbana

(16) The president of the University, with the concurrence of the appropriate administrative officers, recommends the award of the following contracts for common area improvements in the Illinois Street Residence Halls at the Urbana campus. The award in each case is to the lowest responsible bidder on its base bid plus acceptance of the alternates indicated. Division I — General Grunloh Construction, Effingham Base Bid Alt. G-l Alt. G-2 $499 900 6 860 -2 500 $504 260 Division II — Heating A 8c R Mechanical Contractors, Inc., Urbana Division HI — Ventilation A 8c R Mechanical Contractors, Inc., Urbana Division TV — Electrical Central Illinois Electric Company, Pesotum Total

Base Bid

29 600

Base Bid

38 400

Base Bid

103 490 $675 750

It is further recommended that the contracts, other than the contract for general work, be assigned to the contractor for general workFunds are available from the proceeds of the Auxiliary Facilities System, Series 1991 Revenue Bond issue. A schedule of the bids received and a description of the alternates have been filed with the secretary of the board for record. The project consists of the construction of an entrance addition and the remodeling of existing administrative, lounge, study, meeting, and exercise areas at the Illinois Street Residence Halls. General electric and mechanical systems work consists of both new work and replacement of and modifications to existing areas and systems.

On motion of Ms. Reese, these contracts were awarded by the following vote: Aye, Dr. Bacon, Mr. Boyle, Mrs. Calder, Mr. Downey, Mrs. Gravenhorst, Mr. Lamont, Ms. Reese, Mrs. Shepherd; no, none; absent, Mr. Grabowski. (Governor Edgar asked to be recorded as not voting on this item.) (The student advisory vote was: Aye, Ms. Caporusso, Mr. Mitchell; no, none.)

Contracts, Outdoor Tennis Facilities, Urbana

(17) The president of the University, with the concurrence of the appropriate administrative officers, recommends the award of the following contracts for the