UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1990 [PAGE 481]

Caption: Board of Trustees Minutes - 1990
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 481 of 648] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



1992]

Division II — Plumbing Bert C. Young & Sons Corporation, Bellwood

UNIVERSITY OF ILLINOIS

469

Base Bid Alt. #2 Alt. #3

$142 050 800 11 500

$

Division HI — Heating, Piping, Refrigeration and Temperature Control Hanley Mechanical, Inc., Chicago Division TV — Ventilation and Air Distribution Webster Sheet Metal, Crestwood Division V — Electrical Base Bid Alt. #2 Alt. #6 Alt. #7 $196 400 625 9 810 1 330

154 350

Base Bid

194 900

Base Bid

148 000

208 165 $1 668 655 Funds are available from the Hospital Income Fund and the Restricted Funds Operating Budget of the College of Medicine. A schedule of the bids received and a description of the alternates have been filed with the secretary of the board for record.

On motion of Dr. Bacon, these contracts were awarded by the following vote: Aye, Dr. Bacon, Mr. Boyle, Mrs. Calder, Mr. Downey, Mr. Grabowski, Mrs. Gravenhorst, Mr. Lamont, Ms. Reese, Mrs. Shepherd; no, none; absent, Governor Edgar. (The student advisory vote was: Aye, Ms. Caporusso, Mr. Mitchell; no, none.)

Contracts, Grainger Engineering Library Information Center, Urbana

(8) The president of the University, with the concurrence of the appropriate administrative officers, now recommends the award of the following contracts based on the lowest responsible bid, plus acceptance of the indicated alternates. Bid Item # i — Building and Site Demolition American Demolition Corporation, Bloomingdale Base Bid . . . Bid Item #5 — Building Earthwork and Cast-In-Place Concrete Duce Construction Company, Tolono

$ 178 245

Base Bid . . . Alt. 1

$961 000 3 000 964 000

Bid Item #6 — Structural Frame Carter Steel & Fabricating Company, Bellefontaine, Ohio

Base Bid Alt. 1 ...

$898 000 9 600 907 600 $2 049 845

Total