UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1990 [PAGE 255]

Caption: Board of Trustees Minutes - 1990
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 255 of 648] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



1991]

UNIVERSITY OF ILLINOIS

243

following vote: Aye, Dr. Bacon, Mr. Boyle, Mrs. Calder, Mr. Grabowski, Mr. Lamont, Ms. Reese, Mrs. Shepherd, Mr. Wolff; no, none; absent, Governor Edgar, Mrs. Gravenhorst. (The student advisory vote was: Aye, Mr. Forbes; absent, Ms. Kelly.)

Contract, Resurface Parking Lot E-E1, Chicago

(20) T h e president of the University, with the concurrence of the appropriate administrative officers, recommends award of a contract for $104,719 to J. C. Blacktop, Inc., Itasca, the low bidder on its base bid, for the resurfacing of parking lot E-El at the southwest corner of West Polk and South Paulina Streets at the Chicago campus. T h e work will include filling sunken pavement areas to eliminate water ponds, replacing rutted paving at the parking lot entrance, modifying existing drainage structures to improve drainage, and resurfacing the entire lot with asphalt. Funds are available in the operating budget of the Chicago campus Auxiliary Services Parking Division. A schedule of the bids received has been filed with the secretary of the board for record.

On motion of Ms. Reese, this recommendation was approved by the following vote: Aye, Dr. Bacon, Mr. Boyle, Mrs. Calder, Mr. Grabowski, Mr. Lamont, Ms. Reese, Mrs. Shepherd, Mr. Wolff; no, none; absent, Governor Edgar, Mrs. Gravenhorst. (The student advisory vote was: Aye, Mr. Forbes; absent, Ms. Kelly.)

Contract, Parking Structure No. 1 Repairs, Chicago

(21) T h e president of the University, with the concurrence of the appropriate administrative officers, recommends award of a contract for $208,352 to William H. Kelly Company, Dolton, the low bidder on its base bid plus acceptance of alternates no. 1 and no. 2, for the repair of parking structure no. 1, 1100 West Harrison Street, at the Chicago campus. T h e work will include making the necessary repairs to concrete deck areas spalled due to chloride corrosion and sealing concrete deck surfaces from ground to fifth level. This project will reduce further deterioration of concrete surfaces and maintain the structural integrity and durability of the structure. Funds are available in the Auxiliary Facilities System Repair and Replacement Reserve. A schedule of the bids received and a description of the alternates have been filed with the secretary of the board for record.

On motion of Ms. Reese, this recommendation was approved by the following vote: Aye, Dr. Bacon, Mr. Boyle, Mrs. Calder, Mr. Grabowski, Mr. Lamont, Ms. Reese, Mrs. Shepherd, Mr. Wolff; no, none; absent, Governor Edgar, Mrs. Gravenhorst. (The student advisory vote was: Aye, Mr. Forbes; absent, Ms. Kelly.)

Contracts, General Art Building and Industrial/Graphic Design Studio, Urbana

(22) T h e president of the University, with the concurrence of the appropriate administrative officers, recommends award of the following contracts for interior construction for two recently erected 5,000 gsf pre-engineered metal buildings at the Urbana campus to house the Graduate Industrial/Graphic Design program and