EXTRACTED TEXT FROM PAGE:



244

BOARD OF TRUSTEES

[April 11

provide a general support facility for the entire five-building complex. T h e award in each case is to the lowest base bidder plus acceptance of the indicated alternate. Division I—General McDowell Builders, Inc., Sidell Base B i d . . . . $ 93 432 Alt. G-l . . . 3 142 (3 percent) $ 96 574 Division II—Plumbing Paul H. McWilliams & Sons, Inc., Champaign Division III—Ventilation and Air Distribution Hart & Schroeder Mechanical Contractors, Inc., Champaign Division IV—Electrical Witte Electric Company, Champaign Total

Base Bid

20 600

Base Bid

39 300

Base Bid

44 845 $201 319

T h e interior finishes will consist primarily of studios, seminar critique rooms, and offices; construction will include gypsum board partitions, metal doors and frames, acoustical tile ceiling, heating, ventilation, and air conditioning, plumbing and electrical work. Funds are available from the Fiscal Year 1991 institutional funds operating budget of the Urbana campus. A schedule of the bids received and a description of the alternate have been filed with the secretary of the board for record. O n motion of Ms. Reese, these contracts were awarded by t h e following vote: Aye, Dr. Bacon, Mr. Boyle, Mrs. Calder, Mr. Grabowski, Mr. L a m o n t , Ms. Reese, Mrs. S h e p h e r d , Mr. Wolff; n o , n o n e ; absent, G o v e r n o r Edgar, Mrs. Gravenhorst. ( T h e student advisory vote was: Aye, Mr. Forbes; absent, Ms. Kelly.) Contracts, Dining Rooms Remodeling, Gregory Drive Residence Halls, Urbana (23) T h e president of the University, with the concurrence of the appropriate administrative officers, recommends award of the following contracts for remodeling Gregory Drive Residence Halls Dining Rooms (Garner, Forbes, and Hopkins Hall) at the Urbana campus. T h e award in each case is to the lowest base bidder. Base Bid General Work Grunloh Construction, Inc., Effingham Plumbing Work Paul McWilliams 8c Sons, Inc., Champaign Heating and Air Distribution Work Reliable Plumbing 8c Heating Company, Champaign Alternate G-l Total

$610 000

$ 2 939

$612 939

23 300

23 300

12 875

12 875