Caption: Map of UIUC (2001) (ACES Relocation) This is a reduced-resolution page image for fast online browsing.
![](https://uihistories.library.illinois.edu/REPOSITORYCACHE/13/UkzwO0QZ8s3525aD38tbV9hiM51WGmFArYa94vCo3AP4De3yUs4wZ6nOTb48KgmXBl344dDOlU522jJ1N6ecXM348dAkmGIs5itVBXnd7tuu_8581-5.jpg)
EXTRACTED TEXT FROM PAGE:
PHASE 2 (Estimated Duration: 24 months) CAPITAL COSTS LAND .................................................................................................................. $4,518,000 BUILDINGS ...................................................................................................... $17,214,000 • Dairy Complex DEMOLITION ...................................................................................................... $2,000,000 INFRASTRUCTURE ......................................................................................................... $0 ______________________ TOTAL: $23,732,000 RECURRING COSTS $1,386,000 4
| |