JnB^Number: I Engineering hltcct/Engineer: Vania B B • Year: ISSS ^ Corrective HVAC System Improvements ^ f L e c t Budget: $137,000 p^ject Summary: Includes improving the heating, ventilating, and air conditioning systems ^VAO in ousting Building "C, I, and HL.H The project also included a ventilating hood over kilns in the ceramic lab (Building T ) . The areas to be improved include the printing and duplicating area (Building "C") to alleviate the build-up of fumes and to solve reoccurring discomfort; the graphics and sculpture lab (Building V ) to prevent fume build-up and improve air circulation; and the WSSR studio area (Building "L") to improve working conditions because of the heat build-up primarily due to heat-generating radio broadcasting equipment. Contractor^): Doyle Plumbing and Heating, Jacksonville Construction Start Date: December 1984 Completion: September 1985 Fiscal Year: 1985 Project: Gymnasium Addition - Building "D" Total Project Budget: $500,000 Architect/Engineer: Allied Design Consultants, Inc. Edward Long Mechanical «- • * c «o~,. Thi< nmiect included the construction of a 10,080 square foot addition to ^ ^ ^ ^ S S ^ m n a s i u n , , a storage room and a W » ^ ™ the n e t s u t u r e to the buildings. The project also included minor remodehng m Buudmg D. Contractor^) General - R. D. Lawrence Construction Co. ($319,000) Plumbing - Springfield Mechanical Corp. ($11,452) Heating/Ventilating - E. L. Pruitt Co. ($14,243) Electrical [ Mansfield Electric ($24,628) Construction Start Date: November 1984 • mpletion: October 4, 1985 93 L
| |