I<Y,S*S BBS! B • H

| i | M Ferry and Henderson, Architects . yfa project included the fabrication and installation of a hydraulically-operated § h^iinakes possible the creation of a fore-stage infrontof the proscenium opening which platform jg create an orchestra pit immediately in front of the stage or if further lowered can be 1°* additional seats. The backstage lift is a freight elevator which travels from the stage I E H H | level to the lower level of the building. Kg loading | m | WsV K f f i General - R. B. Evans/Lawrence-Rogers, Ltd. ($24,845) Elevator - Montgomery Elevator Co. ($145,946) Electrical - Mansfield Electric Co. ($4,425)

SB

Date: Dcm e i982 ee br

Completion: December 14, 1983 (final acceptance)

equipment. Contractor*): Various theatrical equipment contractors Construction Start Date: March 1981* Completion: September 1981* •estimated 91