Fiscal Yean 1979 Project: Energy Conservation Improvements Total Project Budget: $345,000 CDB Project Number: 823-012-001 Architect/Engineen Maslauski and Litvan Ralph Hahn and Associates Project Summary: Included double-glazing the large window areas in the metal build installing economizer plenums on existing rooftop HVAC units, and insulating and repiaci ' " ^ fcscia on Phase A of the metal buildings. Second part of this project was bid November 11 "IOR* which included conversion of most ring road fixtures to high pressure sodium and conv • incandescent lighting in Building "D" to fluorescent. ^"8 Contractor^): General - Evans Construction Co. ($222,945) Ventilating - Henson Robinson Co. ($45,890) Second part - Mansfield Electric Co.

Construction Start Date: August 1980; second part - December 1982 Completion: January 30, 1981 (substantial); second part - June 1983

Fiscal Year: 1979 Project: Cathodic Corrosion Protection System Total Project Budget: $15,000* CDB Project Number: N/A Architect/Engineer: In-house Project Summary: This is for the installation of magnesium anodes on the underground natural gas piping system for the purpose of reducing corrosive deterioration. Contractor(s): Miller and Son Plumbing and Heating, Inc. ($10,373) Construction Start Date: July 1979 Completion; Approximately September 1979 •estimated