UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: UIS History 1969-1995 (Sangamon State Univ) [PAGE 114]

Caption: UIS History 1969-1995 (Sangamon State Univ)
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 114 of 117] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



in

*J. Emergency Telephone System r : & i Budget: S80,000 j i X n g i n e e r : In-house .-ct Summary: This project includes the purchase and installation of twelve emergency Phones at various campus locations. By pushing a single button, the telephone will Automatically dial the university police office to enable the caller to get an immediate response to their problem.

Contractor(s):

fiSC

Progressive Electric ($77,910)

Construction Start Date: May 1995 Completion: Project not yet completed.

Fiscal Yean 1995 Project: Resurfacing Parking Lot HAM Total Project Budget: $220,000 Architect/Engineer: Coombe-BIoxdorf, P. C. Project Summary: Project includes resurfacing and improving parking lot "A" including repairing existing base, improving drainage conditions, installing curbs along the service drive, providing § 1-1/2" asphalt overlay, and restriping parking spaces and crosswalks. Contractor^): P. H. Broughton ($174,899) Construction Start Date: May 20, 1995 Completion:

111