1993 This project was divided into two parts. Part 1 includes the design and project S u * ^ r y ' underground primary electrical system to serve Buildings "A" through "L" Instruction o f a n ntec j switches and all underground conduit and manholes and handholes for iflHig all V*d~m™lc ^ for fiber optic cable. Also included was electric submeters and a M high voltage posting submeter readings to the energy management computer. The ^er-Colman sysre ^ £ ^ i m p l e r n e n t e d b y ^ state of Illinois Central Management fiber optic po^ 011 D e p a r t r n e nt. The fiber optic portion of the budget included the purchase of Services Teleco £ \ including HUBS, servers, and network cards equipment by tn i„pe portion of the budget - $524,950 High voltage portion - Anderson Electric Co., Springfield ($414,600) ^ ^ ^ portion - Consolidated Communications ($185,612) Contractor(s): Construction Start Date: Part 1 - June 1993; Part 2 - September 1993 Completion: Part I - March 1994; Part 2 - May 1994 Fiscal Yean 1993 Project: Asphalt Overlay I Inner Ring Road Total Project Budget: $32,570 Architect/Engineer: In-house Project Summary: Grade, prime, and install 2" asphalt overlay on two eleven foot wide traffic lanes on the inner ring road. Contractor^): Sankey Construction Inc., Springfield ($32,570) Construction Start Date: August 1993* Completion: October 1993* 'estimated 107
| |