UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: UIS History 1969-1995 (Sangamon State Univ) [PAGE 106]

Caption: UIS History 1969-1995 (Sangamon State Univ)
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 106 of 117] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



fiscal Yean 1990 project: Stadium Parking Lot Total Project Budget: $20,000' COB IVoject Number: N/A Architect/Engineer: In-house project Summary: This 130' x 480' (200 spaces) parkin* lot (fie university grounds crew. When the inner ring road ^ ° St entirel y constructed hv ^ployed to place earth fill in the area of the parking l ^ Z ^ S T ' ** « > ^ ^ installed by the grounds crew. CA-6 rock was then placed oveTtt^ *' geotechn ical fabric was g r a d e d to * thickness o f approximately 5" and rolled by the grounds crew. Later an A-2 nii?*l ^ ou ana chip surface was applied Construction Completion: September 1989

Fiscal Yean 1991 Project: Repair and Renovation - "H" & T Roof Replacement Total Project Budget: $239,400 H project Number: 823-010-040 Architect/Engineer: Allied Design Consultants Project Summary: Removal and replacement of roofing membranes on Buildings "H" and "I The roofing project used only a portion of the budget. The balance of the budget was saved and put together with the balance of FY91 Repair and Renovation funding for the Building "K" roof replacement and remodeling. The actual amount of the repair and renovation appropriation for FY91 was $487,800 (two years at $239,400/year). However, only $239,400 was released in FY91. jhe balance was released in FY93. Contractors): Henson Robinson Co., Springfield ($87,447) Construction Start Date: July 29, 1991 Completions December 10, 1991 (substantial) •estimated 103