37

Medical Center New Contracts

With Wham National Foundation, M a r c h of Dimes C-218 State of Illinois, D e p a r t m e n t of Public Aid State of Illinois, D e p a r t m e n t of Public H e a l t h N o . 7032 United States Public H e a l t h Service N I H N01 CM67090 Total Purpose Birth defects medical service program Facilitate referral t o a n d follow-up with those c o m m u nity resources which provide Title X X service p r o grams Provide c o m p u t e r time for d a t a analysis a n d tabulated rintouts in connection with the Emergency Medical ervices Program Isolation of antineoplastic agents from plants Amount to Be Paid to the Uniotrsity % 9 906

250 000

25 000

S

338 250

% 623 156

Change Orders

Purpose Amount to Be Paid to the University

With Whom United States D e p a r t m e n t of Health, Education, and Welfare: N01 C P 43318 N01 C P 43345 Total

Studies of the molecular mechanism of carcinogenesis by oncogenic viruses Supply of fresh sterile h u m a n specimens from neo-plastic material for cancer research

% 119 4 1 8 57 3 0 9 S 176 727

Change Orders

Purpose Cost-plus contract — heating, process piping, refrigeration, a n d temperature control; Install new humidifier a n d coil o n the Biological R e sources Laboratory Reliable Sheet M e t a l Works, Inc. Cost-plus contract — ventilation work: Remodel air supply system in the Biological Resources Laboratory Cost-plus contract — general work: T a l Rauhoff, I n c . Window renovation on floors 1, 2, a n d 3 in the Public H e a l t h Building Install mail bag receiving a n d shipping conveyor with e w e r positioning mechanism in the University of llinois Hospital Corrective repairs to the window wall construction on the north elevation of t h e Administrative Office Building Erect a temperature-controlled room on the 7th floor of the Second Unit, Dentistry-Medicine-Pharmacy Building Paint finish on interior wood surfaces of newly installed windows in staff apartments Remodel autopsy amphitheater in Second Unit, Dentistry-Medicine-Pharmacy Building Total With Whom N u - W a y Contracting Corporation Amount to Br Paid by the University % 10 1 5 2

10 3 5 0 9 Olfr

13 2 4 ? 10 706 12 8 7 6 12 0 1 3 15 1 4 5 % 9TT94

f

Urbana-Champaign New Contracts

With Whom T h e A O P A Air Safety Foundation C h a m p a i g n County Regional Planning Commission N o . 273 Davis, Miner, a n d Barntull 9366 Northeastern Illinois Planning Commission 76C-I15 Purpose Develop a flight instructor refresher course C o m m u n i t y values in C h a m p a i g n County Technical conduct of survey work o n applications for apprenticeship to t h e International Brotherhood of Electrical Workers Sediment oxygen d e m a n d determinations for major streams in nortficastern Illinois Amount to Bt Paid to the University S 23 232 8 000 6 10O 78 4 4 0