UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1976 [PAGE 735]

Caption: Board of Trustees Minutes - 1976
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 735 of 770] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



724

BOARD OF T R U S T E E S Engineering services, cont'd Instrument Shop Laboratory, remodeling, 289 Liquid Storage Facility, 289 parking facilities, 360 change, 398 patient care areas, remodeling, 319 Pharmacognosy and Pharmacology Laboratory, remodeling, 289 Pharmacy Laboratory, remodeling, 289 Pharmacy Offices, remodeling, 289 remodeling, 188, 319, 320, 628 Replacement Hospital, 65, 289 security system, Phase II, remodeling, 289 Student Residence Hall, main kitchen, remodeling, 526 Peoria School of Medicine, site improvements, 289 Rockford School of Medicine, Phase V, remodeling, 288 site improvements, 320 utilities, 320 University _ of Illinois-Willard Airport, air conditioning, 434 Airport Traffic Control Tower, supplement, 290 hangar area, paving, 290 Terminal Building, addition, feasibility study, 603 Urbana, animal room, remodeling, 321 Architecture Building, life-safety project, 261, 289 Auditorium, roof replacement. 321 Central Supervisory Control Center, 262 utilities, 289 Cohle Hall, remodeling, 321 College of Engineering, remodeling, 320 electrical load center, 319 energy conservation and heating control, 434 English Building, remodeling, 289 Freer Gymnasium, remodeling, 320 Gregory Hall, remodeling, 434 Mechanical Engineering Laboratory, remodeling, electrical modernization, 320 Memorial Stadium, lighting, Phase I, 398 Old Large Animal Clinic, remodeling. 434 Peabody Drive, site improvements, 289 street improvements, 288 Pennsylvania Avenue, site improvements, 289 street improvements, 288 Physics Research Laboratory, addition, 628 remodeling, 628 Speech and Hearing Clinic, 289 steam and chilled water delivery, 262 Turner Hall Addition, 288, 289 utilities, 320 Veterinary Medicine Building, remodeling, 319, 321 Visual Arts Laboratory, remodeling, 320 Volatile Chemical Storage Building, 434 English as a Second Language, Department of (Urhana), intensive English institute, housing, lease, 361 English Building (Urbana), contracts, remodeling, architectural services, 289 engineering services, 289 preliminary program planning, architectural services, 261 English competency test (all-University), applicants whose native or primary language is other than English, disapproved, 597 Ennis, R. H., leave of absence, 559 Entomology, Department of (Urbana), head of ' department, appointment, 470 Environment Seven, Ltd., contract, 434 Environmental Systems Design, Inc., contracts, 262, 288 Epstein, A., and Sons, Inc., contracts, 65, 289 Epstein, R. B., appointment, 149 Epstein, S. S., appointment, 616 Equal Opportunity Committee, See Affirmative Action/Equal Opportunity Committee Erbe, Brigitte, leave of absence, 565

Elyn, M., leave of absence, 223 Emerson C. H-, II, appointment, 49 Emery, W. L., inventions, patent rights, percentage of income distributed to inventor, 500 release to Foundation, 500 Endowment funds, Allerton Trust Farms, use of proceeds of sale of landfill for roadbed construction, 371 consolidation of two trust accounts into single account administered by First National Bank of Chicago^ authorization, 272 investment, buy-sell list, 408 policies and procedures, 296 revision, 366 reports, 73, 116, 137. 161. 192, 243, 268, 325, 367, 405, 442, 460, 505, 506, 534, 535, 584, 605, 633, 694 Energy consumption and cost, status report, 146 Energy Engineering Department of (Chicago Circle), head of department, appointment, 345 Energy Resources Center (Chicago Circle), director, appointment, 8 transfer of jurisdiction from College of Engineering to Office of Vice Chancellor for Academic Affairs, 174 Engel, Frieda H., leave of absence, 218 Engel, J. D., appointment, 386 Engelman, R. M., appointment, 427 Engineering, College of (Chicago Circle), degrees, Bachelor of Science, engineering, bioengineering area of concentration, changes, 389 engineering management, established, 351 conferred. 328, 329, 696, 697 Master of Science, svstems engineering, established, 353 Energy Resources Center, transfer of jurisdiction to Office of Vice Chancellor for Academic Affairs, 174 Engineering, College of (Urbana), contracts, remodeling, architectural services, 320 engineering services. 320 degrees, conferred, 76, 122, 194, 332, 463, 538, 699 Engineering Hall (Urhana), contract lightning protection system, replacement, 239 Engineering Management (Chicago Circle), major, undergraduate, established. 351 Engineering Open House Memorial (Urbana), noninstructional facility designation, request to Illinois State Board of Higher Education, 236 m Engineering Research Laboratory (Urhana), contract, roof resurfacing, 64 Engineering services, contracts, Chicago Circle, exterior campus lighting, Phase I, 262 Phase II, site improvements, 288 Library Addition, 580 remodeling^ 319, 628 Roosevelt Road Building, remodeling, 287, 288 Science and Engineering Laboratory, remodeling, 288 security system, remodeling, 289 stack emission control system, utilities, 288 rescission of original contract, 501 Medical Center, building equipment automation, remodeling, 289 chilled water lines, remodeling, 320 Dentistry-Medicine-Pharmacy Building, First Unit, remodeling, air conditioning, 320 Second Unit, remodeling, 288, 289 exterior lighting and graphics, site improvements, 289 Eye and Ear Infirmary, emergency generator, 627 fire alarm system, remodeling, 289 General Hospital, hospital clinics, remodeling. 288 awardof new contract, 434 rescission of original contract, 434 Hospital Laboratories, remodeling, 288