UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1976 [PAGE 704]

Caption: Board of Trustees Minutes - 1976
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 704 of 770] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



1976]

UNIVERSITY OF ILLINOIS

693

Amount to Be Paid to the University % 30 000

With Whom United States Navy N00014-76-C-0745 University of Chicago, Argonne National Laboratory 31-109-38-3428 Total

Purpose Investigate several novel chemiluminescent reactions t h a t have a high potential for efficient light production with respect to mechanistic and energetic requirements Investigation of an improved theory governing the p r o p agation of fluid pressure transients in elastic tubes

10 000 93 626 678

New Contracts

With Whom Colorado State University Purpose Provide professional services in the area of gross a n a t o m y for veterinary students Amount to Be Paid by the University $ 22 291 $ 22 291

Change Orders

With Whom Agency for International Development AJD/afr-550 National Aeronautics and Space Administration: NSG-1063 NSG-2119 Small Business Administration SBA-0151-PMA-76 United States D e p a r t m e n t of Health, Education, and Welfare 400-75-0019 United States D e p a r t m e n t of T r a n s p o r t a t i o n : D O T FR-30022 DOTHS-5-01131 United States Navy N00014-75-C-0918 University of California: SC0014 Total Purpose Technical advice and assistance requested by the government of Tunisia Amount to Be Paid to the University % 176 482

Theoretical investigation of nuclear-induced plasma kinetics Pilot interaction with a u t o m a t e d airborne decisionmaking systems Provide m a n a g e m e n t counseling a n d technical assistance t o small business concerns O p e r a t i o n of E R I C Clearinghouse on Early Childhood Education

26 000 38 668 5 000 181 000

Development a n d testing of new tunnel supports Vehicle tests to study the flow of heat in disc and d r u m braking systems Hydrogen in and on metals

40 055 10 700 50 000

Pest population regulation and control in alfalfa crop ecosystems Pest population regulation and control in soybean crop ecosystems

88 365 59 159 % 675 429

Change Orders

With Whom Barber a n d DeAtley, I n c . Purpose Cost-plus contract — general work: Razing of the building at 1201 West Oregon Street, U r b a n a, Illinois Cost-plus contract — electrical work: Renovation of secondary electrical distribution and lighting in Stiven House located at 708 South Mathews, U r b a n a , Illinois Cost-plus contract — plastering, plaster patching, a n d repair: Plastering, plaster patching, and repair in various buildings

Amount to Be Paid by the University S 8 415

Downtown Electric

12 000

E. T . Drewitch

8 139 % 28 554

Total

Summary

Amount to be paid to the University: Medical Center Urbaha-Champaign Total % 47 151 3 302 107 $3 349 258