EXTRACTED TEXT FROM PAGE:



1976]

UNIVERSITY OF ILLINOIS

625

A schedule of the bids received has been filed with the Secretary of the Board for record. The Roosevelt Road Building is now being remodeled for various University and campus offices and facilities. The existing parking is not adequate for the planned use. The proposed construction will update and increase parking facilities in the parking lots north and west of the building from 283 spaces to 351 spaces, improve vehicular traffic flow from adjoining streets and within the parking area, provide better pedestrian access to the building, and create new areas for service vehicles and temporary contractor storage in the parking lot southeast of the building. The project consists of site clearing, resurfacing approximately 97,500 square feet of existing pavement, installation of 15,500 square feet of new bituminous paving, concrete driveways, curbing, catch basins, lighting and piping modifications, and construction of a guardhouse and refuse enclosure. The bids received are within the funds available, and it is anticipated that the work will be completed in September of this year.

The student advisory vote was: Aye, Mr. Conlon, Mr. Summers, Mr. Szegho; no, none. On motion of Mrs. Rader, these contracts were awarded by the following vote: Aye, Mr. Forsyth, Mr. Hahn, Mr. Howard, Mr. Livingston, Mr. Neal, Mrs. Rader, Mrs. Shepherd; no, none; absent, Mr. Lenz, Mr. Velasquez, Governor Walker.

Contracts for Contractors' Fees for Minor Remodeling and New Construction for FY 1977, Chicago Campuses

(15) The President of the University, with the concurrence of appropriate administrative officers, recommends award of the following cost-plus contracts for minor remodeling and new construction at the Chicago Circle and Medical Center campuses for the period of July 1, 1976, through June 30, 1977, with an option by the University to extend these contracts for an additional period of one year upon the same terms and conditions, the award in each case being to the lowest bidder. Percent for Material General Wm. J. Scown Bldg. Co., Chicago 1 Percent Percent for for Labor Subcontracts 31 25.5 4 1 Total Estimated Fee Payments $14 200 8 150

Plumbing "Dole" Plumbing & Heating, Riverside.. 4.5 Heating, Process Piping, Refrigeration, and Automatic Temperature Control Certified Mechanical Contractors, Inc., Riverside Ventilation and Distribution Systems for Conditioned Air Narowetz Heating and Ventilating Company, Melrose Park Electrical Gibson Electric Company, Inc., Hillside

4.5

25.5

1

23 225

2

28.5

1

14 700

4

30

5

28 650