UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1976 [PAGE 512]

Caption: Board of Trustees Minutes - 1976
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 512 of 770] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



1976]

UNIVERSITY OF ILLINOIS

501

employment of and demand for allied health personnel, expand the institutional and job category scope of the earlier project, and gather information linking level of preparation attained by the allied health professional to job category. T h e study would be conducted over a five-month period, with funding from (1) the Federal AHEC contract administered by the University of Illinois, (2) the Illinois Board of Higher Education, and (3) the Illinois Regional Medical Program as follows. University of Illinois (Federal AHEC funds) $16 000 Il'inois Board of Higher Education 4 525 Illinois Regional Medical Program 6 250 Funds are available from the University of Illinois Area Health Education Center contract. Concurrent approval of this subcontract by the Federal government has been requested. The Chancellor at the Medical Center recommends approval of this contract, subject to concurrence of the Federal government. The Vice President for Academic Affairs and the Vice President for Administration concur. I recommend approval.

The student advisory vote was: Aye, Mr. Conlon, Mr. Summers, Mr. Szegho; no, none. On motion of Mr. Howard, this recommendation was approved by the following vote: Aye, Mr. Forsyth, Mr. Hahn, Mr. Howard, Mr. Lenz, Mr. Livingston, Mr. Neal, Mrs. Rader; no, none; absent, Mrs. Shepherd, Mr. Velasquez, Governor Walker.

Contract for Automatic Sprinkler System for Lower Level of Chicago lllini Union, Medical Center

(13) T h e President of the University, with the concurrence of appropriate administrative officers, recommends award of a contract in the amount of $20,765 to Viking Fire Protection Company, Chicago, the low base bidder, for installation of a complete automatic sprinkler system for the lower level of the Chicago lllini Union building at the Medical Center campus, subject to approval of the project as a noninstructional facility by the Illinois Board of Higher Education. The low bidder did not file certain financial information until after the time prescribed by the bid documents. The University Counsel has indicated that the late filing is a minor irregularity which may be waived, and the recommendation for the award contemplates such a waiver. Funds for this work are available in the Medical Center Bonds of 1964 Account. A report, including a schedule of the bids received, has been filed with the Secretary of the Board for record.

The student advisory vote was: Aye, Mr. Conlon, Mr. Summers, Mr. Szegho; no, none. On motion of Mr. Conlon, this contract was awarded by the following vote: Aye, Mr. Forsyth, Mr. Hahn, Mr. Howard, Mr. Lenz, Mr. Livingston, Mr. Neal, Mrs. Rader; no, none; absent, Mrs. Shepherd, Mr. Velasquez, Governor Walker.

Employment of Engineer for Stack Emission Control System, Chicago Circle

(14) The President of the University, with the concurrence of appropriate administrative officers, recommends that the Board of Trustees concur in the employment