432

BOARD OF TRUSTEES

[October 15

Contracts for Remodeling in Chicago lllini Union Building, Medical Center (12) T h e President of the University, with the concurrence of appropriate administrative officers, recommends award of contracts for converting a vending and eating area into a kitchen and dining room in the Chicago lllini Union Building at the Medical Center campus. T h e award for general work would be made to the low bidder on its base bid, deductive alternate 1 plus the additive assignment fee; the awards for Divisions I I , I I I , I V , and V on their base bids; and the award for Division V I on the base bid plus acceptance of deductive alternates 2 and 3. Division I — General Work Wm. J. Scown Building Co., Chicago Division II -— Plumbing Work The Nu-Way Contracting Corporation, Chicago Division III — Heating and Air Conditioning Bert C. Young and Sons Corp., Bellwood Division IV— Ventilation Work Narowetz Heating and Ventilating Company, Melrose Park Division V — Electrical Work C & H Electric Co., Chicago Division VI — Kitchen Equipment Southern Equipment —• Division of McGraw Edison, Chicago Total $ 39 660 00 8 940 00 7 436 00 10 296 00 10 600 00 28 250 68 $105 182 68

It is further recommended: 1) that all contracts, other than the contract for general work, be assigned to the contractor for general work, making the total of its contract $105,182.68; and 2) that an agreement be entered into with the Wm. J. Scown Building Co. for the assignment of the other contracts. Funds for this work are available from the budgeted funds of the Chicago lllini Union Building at the Medical Center. A schedule of the bids received has been filed with the Secretary of the Board for record. This is a noninstructional project and as such is subject to further action by the Board of Higher Education. T h e student advisory vote was: Aye, M r . Conlon, M r . Summers, M r . Szegho; no, none. O n motion of M r . Livingston, these contracts were awarded by the following vote: Aye, Mr. Forsyth, M r . H a h n , M r . Howard, M r . Lenz, M r . Livingston, M r . Neal, Mrs. Rader, Mrs. Shepherd, M r . Velasquez; no, n o n e ; absent, Governor Walker. Noninstructional Capital Improvements for FY 1976, Chicago Circle and Medical Center (13) T h e Illinois Board of Higher Education has asked that all "noninstructional" projects presently planned for FY 1976 be identified and submitted for action. Accordingly, the following list of projects for the Chicago Circle and Medical Center campuses has been prepared for projects for safety, recreation, and general remodeling of noninstructional buildings and facilities.1 The President of the University, with the concurrence of the appropriate administrative officers, recommends approval of these projects, subject to further action by the Board of Higher Education.

1

This is a supplement to the list approved by the Board of Trustees on September 17, 1975.