UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1976 [PAGE 271]

Caption: Board of Trustees Minutes - 1976
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 271 of 770] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



260

BOARD OF TRUSTEES

[April 16

On motion of Mr. Livingston, these contracts were awarded by the following vote: Aye, Mr. Forsyth, Mr. Hahn, Mr. Howard, Mr. Lenz, Mr. Livingston, Mr. Neal, Mrs. Rader, Mrs. Shepherd, Mr. Velasquez; no, none; absent, Governor Walter.

Contracts for Remodeling in Hospital Addition, Medical Center

(17) The President of the University, with the concurrence of appropriate administrative officers, recommends award of the following contracts for remodeling Room 824 in the Hospital Addition, Medical Center campus, the award in each case being to the low bidder on the base contract work. Division I — General Work Wm. J. Scown Building Co., Chicago $ 5 098 Division II — Plumbing Work Albrite Plumbing Service, Chicago 2 120 Division III — Process Piping and Temperature Control Work Allied Mechanical Industries, Inc., Chicago 4 054 Division IV — Ventilation Work C lima temp Contractors/Engineers, Inc., Chicago 9 750 Division V — Electrical Work Kelso Burnett Co., Rolling Meadows 3 530 Division VI — Laboratory Equipment Kewanee Scientific Equipment Corp., Statesville, North Carolina 5 954 Funds which have been allocated to this project are available in the budget of the Physical Plant Department. A schedule of the bids received has been filed with the Secretary of the Board for record. O n m o t i o n of M r . H o w a r d , these contracts w e r e a w a r d e d by the foll o w i n g v o t e : A y e , M r . Forsyth, M r . H a h n , M r . H o w a r d , M r . Lenz, Mr. Livingston, M r . N e a l , M r s . R a d e r , M r s . S h e p h e r d , M r . V e l a s q u e z ; n o , n o n e ; absent, G o v e r n o r Walker.

Contracts for Remodeling in College of Pharmacy Building, Medical Center

(18) The President of the University, with the concurrence of appropriate administrative officers, recommends award of the following contracts for remodeling Rooms 304, 304-K, and 305 in the College of Pharmacy Building at the Medical Center campus, the award in each case being to the low bidder on the base contract work. Division I — General Work Mutual Contracting Co., Chicago Division II — Plumbing Work Fettes, Love & Sieben, Chicago Division III— Process Piping and Temperature The Nu-Way Contracting Corp., Chicago Division V — Electrical Work Kelso Burnett Co., Rolling Meadows Division VI — Laboratory Furniture I. P. Rieger Company, Oak Brook $ 4 686 160 Control Work 395 500 10 095