UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1976 [PAGE 250]

Caption: Board of Trustees Minutes - 1976
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 250 of 770] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



1975]

UNIVERSITY OF I L U N O I S

239

On motion of Mr. Livingston, these contracts were awarded by the following vote: Aye, Mr. Forsyth, Mr. Hahn, Mr. Howard, Mr. Lenz, Mr. Livingston, Mr. Neal, Mrs. Rader, Mrs. Shepherd, Mr. Velasquez; no, none; absent, Governor Walker.

Contract for Skylight, Gutter, and Lightning Protection System Replacement, Engineering Hall, Urbana

(24) The President of the University, with the concurrence of appropriate administrative officers, recommends the award of a contract for $86,371 to the Industrial Roofing Company, Mattoon, the low bidder, for skylight, gutter, and lightning protection system replacement to Engineering Hall at the Urbana campus. Funds are available in the budget of the Operation and Maintenance Division. O n m o t i o n of M r . H a h n , this c o n t r a c t w a s a w a r d e d by t h e following

vote: Aye, Mr. Forsyth, Mr. Hahn, Mr. Howard, Mr. Lenz, Mr. Livingston, Mr. Neal, Mrs. Rader, Mrs. Shepherd, Mr. Velasquez; no, none; absent, Governor Walker.

Contracts for Roofing Work, Urbana

(25) T h e President of the University, ministrative officers, recommends award the roofs and for miscellaneous roofing the award in each case would be made to with the concurrence of appropriate adof the following contracts for resurfacing repairs for the projects identified below; the low base bidder. $45 393 49 386 30 900

Peabody Drive Food Service Center Industrial Roofing Company, Mattoon Snyder Hall Hitchins Roofing Company, Inc., Urbana Main Library (Portions of First, Third, and Fourth Additions; fiat roofs) Petry Roofing and Sheet Metal Company, Champaign

T h e work consists of resurfacing the roofs with pitch and gravel and flashing, guttering, and lightning protection work as required. Funds for the Peabody Drive Food Service Center and Snyder Hall projects are available in the Building Repair and Maintenance reserves in the budget of the Housing Division. Funds for the Main Library project are available in the budget of the Operation and Maintenance Division. A schedule of the bids received has been filed with the Secretary of the Board for record.

On motion of Mr. Howard, these contracts were awarded by the following vote: Aye, Mr. Forsyth, Mr. Hahn, Mr. Howard, Mr. Lenz, Mr. Livingston, Mr. Neal, Mrs. Rader, Mrs. Shepherd, Mr. Velasquez; no, none; absent, Governor Walker.

Purchases

(26) T h e President submitted, with his concurrence, a list of purchases recommended by the Directors of Purchases and the Vice President for Planning and Allocation. T h e list of purchases was presented in two categories: purchases from appropriated funds (i.e., from State appropriations to the University) and purchases