UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1974 Version B [PAGE 602]

Caption: Board of Trustees Minutes - 1974 Version B
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 602 of 680] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



594

BOARD OF TRUSTEES

[ June 19

General Work Nathan Linn & Sons, Inc., Chicago Plumbing Peter H. Smith Company, Chicago Heating, Air Conditioning, and Temperature Control Certified Mechanical Contractors, Inc., Chicago Ventilating Narowetz Heating and Ventilating Company, Melrose Park Electrical G & M Electrical Contractors Co., Chicago Total

$180 994 11 900

68 452 88 388 77 000 $426 734

It is further recommended that all contracts other than the contract for General Work be assigned to the Contractor for General Work, making, the total of this contract $426,734, and that an agreement be entered into with Nathan Linn & Sons, Inc., for the assignment of the other contracts. The fee for this assignment is included in the base bid for the General Work. Funds for this work are available in the University Hospital Revenue Income Account. A schedule of the bids received has been filed with the Secretary of the Board for record. On motion of Mr. Forsyth, these contracts were awarded by the following vote: Aye, Mr. Forsyth, Mr. Hahn, Mr. Howard, Mr. Hughes, Mr. Livingston, Mrs. Rader, Mr. Steger; -no, none; absent, Dr. Bakalis, Mr. Neal, Mr. Swain, Governor Walker.

CONTRACT FOR RESURFACING T H E ROOF O F T H E VETERINARY CLINIC. LARGE ANIMAL UNIT. URBANA

(28) The President of the University, with the concurrence of appropriate administrative officers, recommends award of a contract in the amount of $38,459 to Hitchins Roofing Company, Inc., Urbana, the low bidder for replacement of the roofing surface and other miscellaneous roofing repair for the Veterinary Clinic, Large Animal Unit, at the Urbana campus. Funds are available in the budget of the Operation and Maintenance Division. On motion of Mr. Hahn, this contract was awarded by the following vote: Aye, Mr. Forsyth, Mr. Hahn, Mr. Howard, Mr. Hughes. Mr. Livingston, Mrs. Rader, Mr. Steger; no, none; absent, Dr. Bakalis, Mr. Neal, Mr. Swain, Governor Walker.

INCREASE ARCHITECTURAL CONTRACT FOR T H E MEDICAL RESEARCH LABORATORY ADDITION. MEDICAL CENTER

(29) The President of the University, with the concurrence of appropriate administrative officers, recommends that the contract with Skidmore, Owings & Merrill, Chicago, for the Medical Research Laboratory Addition at the Medical Center campus be increased in the amount of $22,000 for additional work due to the necessity for redesigning the caissons and other work resulting thereafter. Funds are available in state capital appropriations to the University and have been released by the Governor. On motion of Mr. Howard, this recommendation was approved by the following vote: Aye, Mr. Forsyth, Mr. Howard, Mr. Hughes, Mr. Livingston, Mrs. Rader, Mr. Steger; no, none; absent, Dr. Bakalis, Mr. Neal, Mr. Swain, Governor Walker. Mr. Hahn asked to recorded as not voting.