BOARD OF TRUSTEES

[June 20

Heating, Air Conditioning, and Process Piping S. J. Reynolds Co., Inc., Cicero Base B i d . . 16 758 Additive Alternate M-2 8 405 Total 25 163 Ventilation and Air Conditioning Reliable Sheet Metal Works, Inc., Elk Grove Village. .Base Bid 8 698 Plumbing Ewing Plumbing, Inc., River Forest Total Base Bid 875 $86 647

It is further recommended that all contracts other than the contract for General W o r k be assigned to the Contractor for General W o r k , making the total of this contract $86,647, and that an agreement be entered into with Mueller Construction Co. for the assignment of the other contracts. T h e fee for this assignment is included in the base bid for the General Work. Funds for this work are available in the University Hospital Income Account. A schedule of the bids received has been filed with the Secretary of the Board for record.

On motion of Mr. Livingston, these contracts were awarded by the following vote: Aye, Mr. Forsyth, Mr. Hahn, Mr. Howard, Mr. Hughes, Mr. Livingston, Mr. Neal, Mrs. Rader, Mr. Swain; no, none; absent, Dr. Bakalis, Mr. Steger, Governor Walker.

CONTRACTS FOR CONTRACTORS' FEES FOR REMODELING IN ILLINOIS SURGICAL INSTITUTE. MEDICAL CENTER (21) T h e President of the University, with the concurrence of appropriate administrative officers, recommends award of the following cost-plus contracts based on percentages bid for contractors' fees for the second phase of remodeling patient care areas of the Orthopedics Department on the first floor of the Illinois Surgical Institute Building at the Medical Center campus, the award in each case being to the low bidder: Per Per Per Cent Cent Cent Estimated Total for for for SubFee Estimated Materials Labor contract Payments Payments General Tal Rauhoff, Inc., Chicago 5 29 SI 994 00 $14 994 00 Plumbing G. F . Connelly Co., Inc., Chicago 9.5 29 2 575 00 13 975 00 Piping, Refrigeration and Automatic Temperature Control T h e Nu-Way Contracting Corp., Chicago 8 Ventilation Narowetz Heating and Ventilating Company, Melrose Park IS Electrical G & M Electrical Contractors Co., Chicago 7 Total

32

2 322 00

13 122 00

40

-0-

747 50

2 897 50

30

-0-

1 717 00

11 217 00 $56 205 50

In the ventilating bid, Narowetz Heating and Ventilating Company and Reliable Sheet Metal Work, Inc., tied for the low bid. In accordance with the University's regulations adopted pursuant to the Illinois Purchasing Act, the tie was broken by lot since the bids and bidders were deemed equal in every respect, and Narowetz Heating and Ventilating Company is recommended for the award. F u n d s for this work are available in the University Hospital Income Account.