1953]

UNIVERSITY OF ILLINOIS

515

Champaign, including water reclamation installations, plans and specifications and fixed equipment installed relating thereto," subject to release by the Governor. T h e Director of the Physical Plant and the Comptroller recommend award of contracts for this remodeling to the following lowest bidders: General — E . N . DeAtley, Champaign $61 700 Electrical — Potter Electric Service, Urbana 5 478 Plumbing — Reliable Plumbing and Heating Company, Champaign 12 985 Heating — Schroeder's, Champaign 12 500 I concur and recommend that the Comptroller and the Secretary of the Board be authorized to execute these contracts. O n m o t i o n of M r . H i c k m a n , t h e s e c o n t r a c t s w e r e a u t h o r i z e d . CONTRACTS FOR BOTANY ANNEX GREENHOUSE IMPROVEMENTS (13) T h e Director of the Physical Plant and the Comptroller recommend award of contracts for remodeling and other improvements in the Botany Annex Greenhouse to the following lowest bidders: General — Kuhne-Simmons Company, Champaign $13 086 Electrical — Bean Electric and Hardware, Urbana 3 665 Plumbing — Reliable Plumbing and Heating Company, Champaign 4 595 Heating and Temperature Control W o r k — Reliable Plumbing and Heating Company, Champaign 6 295 An appropriation for these improvements is being recommended to the Board separately. I concur and recommend that the Comptroller and the Secretary of the Board be authorized to execute these contracts.

On motion of Mrs. Holt, these contracts were authorized.

CONTRACT FOR REFRIGERATION INSTALLATION IN DAIRY MANUFACTURES BUILDING (14) The Director of the Physical Plant and the Comptroller recommend award of a contract for $6,095 to the Westerlin and Campbell Company, Peoria, the lowest bidder, for refrigeration installations in the Dairy Manufactures Building. This is a part of the improvements in the cheese room for which an appropriation is being recommended separately. I concur and recommend that the Comptroller and the Secretary of the Board be authorized to execute this contract.

On motion of Mr. Grange, this contract was authorized.

COMPTROLLER'S REPORT OF CONTRACTS (15) The Comptroller's report of contracts executed during the period December I to 31, 1952.

With Whom American Potash Institute. Inc. Peoples Book Club, Inc. State of Illinois Bureau of Public Roads United States Air Force (Physiology) United States Air Force (Physiology) United States Air Force (Physiology) United States Air Force (Division of Communications) United States Air Force (Division of Communications) Purpose Nitrogen-potassium balances study Children interests study Reinforced concrete beams study AF i8(6oo)-77 AF i8(6oo)-8o AFi8(6oo)-8i AF i8(6oo)-32i AF i8(6oo)-335 Amount to be Paid to the University $ I 500 00 4 800 00 5 000 00 8 132 50 65 187 00 6 771 00 64 846 00 48 290 00 Dale December 3, 1052 December is, 1952 July 1, 1952 September 1, 1951 J u n e s , 1952 November 10, 1951 April 25, 1952 June ro, 1952