UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1954 [PAGE 1292]

Caption: Board of Trustees Minutes - 1954
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 1292 of 1923] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



1954]

With Whom Seneca Petroleum Company, Inc.

UNIVERSITY OF ILLINOIS

Amount to be Paid by the University

$ 1 614- 00

1289

Effective Date January 18, 1954

Purpose B i t u m i n o u s paving of a l l e y s , Marshfield Avenue properties, Chicago

Leases

With Whom G, W. Filberth Purpose Two-room suite of offices in building located at 719 Main Street, Mount Vernon, Illinois, for use by Division of Services for Crippled Children Farm equipment for use by the Department of Agriculture Amount to be Paid by the University

$1 560 00

Effective Date October 1, 1953

International Harvester Company (Two lease agreements) First floor of building located at Leroy G. Schaufler and 303 South Illinois Street, BelleFred E. Rose ville, Illinois, for use by Division of Services for Crippled Children (seventeen months at $18$ per month)

348 74

February 3, 1954 January zo, 1954

Contract Changes

With Whom American Gas Association Dawe'a Laboratories, Inc. Moorman Manufacturing Company United States Army DA-11-022-ORD-535 United States Army United States Atomic Energy Commission AT(u-i)-67, Project No. 0 United States Navy NObs-62250 Veterans Administration V-3028 V-2213

DA-11-022-ORD-1121

Purpose Air ducts study Rations for broiler production study Poultry nutrition study Anelastic behavior of binary alloys of high-melting metals study Mechanism of tool wear study Structural changes in metals due to annealing after deformation study "Confidential" Civil Engineering Tutoring service for veterans

Amount to be Paid to the University

$12 000 00

Effective Date January 1, 1954 February 3, 1954 February 3, 1954 January 28, 1954 January 29, 1954 January 1, *954 January 4. 1954 September 14, 1953

1 s°° 00

1 500 00 8 003 00 11 100 00 21 roo 00

26 500 00

Charge in each individual case shall be the customary charge, but shall not exceed 33.00 per hour

Adjustments Made in 1951-1952 Cost-Plus Contracts (Adjustments in projects authorized prior to July I, 1953)

With Whom Anderson Electric, Inc. Purpose Noyes Laboratory, room 305a remodeling $ Amount 358 771 Date February 3, 1954

Adjustments Made in 1952-1953 Cost-Plus Contracts (Adjustments in projects authorized prior to July I, 1953)

With Whom Contracting Construction Company (General work) Potter Electric Service Reliable Plumbing and Heating Company Schroeder's Ventilating Purpose Five items: $1,374.28 deduct to £308.21 deduct Two items: £800.00 deduct to £6.69 Botany Annex remodeling Men's Residence Halls Addition No. 2 construction Purpose Eighteen minor items: S60.60 deduct to $678.00 Amount

\% 927 60 1 793 3 1 1 420 00 141 08

Date February, 1954 February, 1954 January 27, 1954 February 9, 1954

Adjustments Made in 1953-1054 Cost-Plus Contracts

With Whom E. T. Drewitch (Plastering) Amount $% 194 29 Date February, 1954

This report was received for record.

1

Deduct.