BOARD OF TRUSTEES

[March 12

necessary piping t o hook up the new system, installation of the absorption unit, remodeling of t h e present condensate water pump, a new chilled water pump, new condensate meter, receiver, and condensate return pump. I concur and recommend t h a t the Comptroller and the Secretary of the Board be authorized to execute this contract.

On motion of Mr. Johnston, this contract was awarded, and the Comptroller and Secretary of the Board were authorized to execute the same.

CONTRACT FOR REROOFING AGRICULTURAL ENGINEERING A N D FILTRATION PLANT BUILDINGS (19) The Director of the Physical Plant and the Vice-President and Comptroller recommend award of a contract for $4,430 to Industrial Roofing Company, Mattoon, the lowest bidder, for reroofing the Agricultural Engineering and Filtration Plant Buildings. Funds are available in the budget of the Physical Plant Department. I concur and recommend t h a t the Comptroller and t h e Secretary of the Board be authorized to execute this contract.

On motion of Mr. Swain, this contract was awarded, and the Comptroller and Secretary of the Board were authorized to execute the same.

CONTRACT FOR EXTENSION OF PNEUMATIC TUBE SYSTEM IN THE RESEARCH A N D EDUCATIONAL HOSPITALS (20) The Director of the Physical Plant and the Vice-President and Comptroller recommend the award of a contract for $15,071 to the Lamson Corporation, Chicago, for extension of t h e present pneumatic tube system in the Research and Educational Hospitals to the Obstetrics and Gynecology Clinic area. This is a non-competitive item because the Lamson Corporation installed the present system and other firms can not furnish compatible component parts for this extension. The work will consist of the installation of a substation in the Obstetrics and Gynecology Clinic on the first floor of the Research and Educational Hospitals to connect with the Medical Records Department in the basement. It will also include installation of a new power exhauster unit and modification of present exhaust and intake manifolds. This will be a part of the remodeling program in the Research and Educational Hospitals, for which funds are available in the state appropriation for "Rehabilitations and Minor Additions to Existing Buildings." I concur and recommend t h a t the Comptroller and the Secretary of the Board be authorized t o execute this contract.

On motion of Mrs. Watkins, this contract was awarded, and the Comptroller and Secretary of the Board were authorized to execute the same.

ADDITIONS TO CONTRACTS FOR ADDITION TO L I N C O L N AVENUE RESIDENCE (21) The Director of the Physical Plant and the Vice-President and Comptroller recommend the following increases in contracts for the construction of t h e addition to the Lincoln Avenue Residence t o provide bedrooms and storage space in the area originally planned as a snack bar: Electric — Aschinger Electric Company, Streator $3 797 75 Plumbing — Robert R. Murphy, Chicago 5 983 00 Funds are available in t h e construction fund for this project. Elimination of the snack bar will result in reductions in the general contract and the equipment contract which will more than offset these increases. I concur and recommend t h a t the Comptroller of t h e Board be authorized to execute t h e necessary contract changes.

On motion of Mr. Herrick, the Comptroller was authorized to execute this change in the contract.