UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1958 [PAGE 179]

Caption: Board of Trustees Minutes - 1958
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 179 of 1897] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



176

With Whom Shewbridge Stadium

BOARD OF TRUSTEES Amount to be Paid by the University

$

150 0 0

[December 18

Effective Date November 9, 1956

Purpose Rental by Chicago Undergraduate Division on November 9, 1956

or 20 per cent of the gate receipts whichever is greater

710 50

Claradine Warren

Cost of tiling land on Warren property

November 7, 1956

Leases

With Whom Hahn, Inc. International Harvester

Co.

Purpose Rental of one HB-60H hi-boy sprayer Rental of one Model I - I I lift type fast hitch rotary hoe

Amount to be Paid by the University

$

167 20 12 63

Effective Date July i, 1956 July 1, 1956

annual rental annual rental Amount to be Paid to the University

$6 0 0 0 0 0

Contract Changes

With Whom American Dairy Association Board of Education of Bismarck Township The Goodyear Tire & Rubber Co. Grace Chemical Co. United States Air Force AF 3 3 (608)-176 United States Army DA 11-175-AV-1582 Veterans Administration V-1001V-96 Purpose Comparison of nutrition value of proprietary infant formulas with that of evaporated milk: Termination of contract of school survey Research on radio spectroscopy of polymers Research on nonprotein nitrogen in sheep nutrition Instruction of military personnel Instruction of military personnel Correspondence courses Effective Date October 15, 1956 November 2, 1956 September 1, 1956 April 1, 1956 October 12, 1956 September 17, 1956 July 26, 1956

625 oo1

2 000 00 2 500 00 I OOO OO 1

Rates per contract Rates per contract

Adjustment Made in 1953-54 Cost-Plus Contract (Adjustment in project authorized prior to July I, 1956)

With Whom Consulting Engineering Service With Whom Harry F. Fisher (Plastering) Purpose Three items: $37.05 to $250.00 Amount $ 332 65 Effective Date October 24, 30, and November 8, 1956

A d j u s t m e n t Made in 1956-57 Cost-Plus Contract Purpose Amount Date Sixteen items: $0.96 deduct to $3 930 38 November, 1956 $2,300.00

This report w a s received for record.

CONTRACT FOR ARCHITECTURAL SERVICES FOR RESIDENCE HALL FOR GRADUATE S T U D E N T S (18) T h e Director of the Physical Plant and the Vice-President and Comptroller recommend award of a contract to Hewitt and Bastian, Peoria, for the design of a residence hall for graduate students at the standard fee of six per cent of the construction contracts for complete architectural and engineering services, and including' supervision of construction. P r o f e s s o r Ambrose Richardson will review the designs of this building in accordance with the current arrangement on new University buildings in general. I recommend approval. T h e Committee on Buildings and Grounds has been consulted and is prepared to support this recommendation.

On motion of Mr. Livingston, this contract was awarded, as recommended, and the Comptroller and Secretary of the Board were authorized to execute the same.

1

Deduct.