1954] College of Dentistry (200 clock hours or less) Residents Nonresidents College of Medicine (200 clock hours or less) Residents Nonresidents

UNIVERSITY OF ILLINOIS

165

Present $2 50 per 25 clock hours or fraction thereof 10 00 per 25 clock hours or fraction thereof

Proposed $3 50 per 25 clock hours or fraction thereof 11 00 per 25 clock hours or fraction thereof

3 00 per 25 clock hours or fraction thereof 12 00 per 25 clock hours or fraction thereof

4 00 per 25 clock hours or fraction thereof 14 00 per 25 clock hours or fraction thereof

On motion of Mr. Johnston, this schedule of fees was authorized.

SPECIAL APPROPRIATIONS FOR NONRECURRING EXPENDITURES (6) The Committee on Nonrecurring Appropriations recommends assignments of funds from the General Reserve as follows: 1. College of Liberal Arts and Sciences, remodeling in the Vivarium $ 9 000 2. College of Engineering, remodeling in Civil Engineering Hall 5 500 3. Chicago Undergraduate Division, purchase of movable equipment and installation of utilities for a Physical Sciences Laboratory 12 000 Total $26 500 I concur.

On motion of Mrs. Holt, these appropriations were made by the following vote: Aye, Mr. Bissell, Mr. Grange, Mr. Herrick, Mr. Hickman, Mrs. Holt, Mr. Johnston, Mr. Livingston, Mr. Megran, Mr. Nickell, Mrs. Watkins; no, none; absent, Mr. Stratton.

APPROPRIATIONS BY THE ATHLETIC ASSOCIATION (7) The Board of Directors of the Athletic Association has approved the following appropriations: For services rendered the Athletic Association by the Alumni Association for the year 1953-54 $3 000 For the replacement of 62 steel and wood rocker hurdles 1 116 These appropriations are submitted to the Board of Trustees for confirmation.

On motion of Mrs. Watkins, the action of the Board of Directors was approved.

CONTRACTS FOR LABORATORY FURNITURE AT THE CHICAGO PROFESSIONAL COLLEGES (8) The Business Manager of the Chicago Professional Colleges and the Comptroller recommend award of contracts to the Kewaunee Manufacturing Company, Adrian, Michigan, the lowest bidder, for the manufacture and installation of laboratory furniture in buildings at the Chicago Professional Colleges as follows: For the Departments of Pharmacology and Physiology — 28 pieces of metal laboratory furniture $17 534 80 I"or the Departments of Hospital Admissions, Bacteriology, Oral Surgery, and Dental Clinics — 22 pieces of wood laboratory furniture. 12 828 00 The work will consist of fabricating and installing sinks, drying racks, benches, and accessories. Funds are available in the Revenue Bond Construction Funds and in a special appropriation made by the Board of Trustees on May 15, 1954, for remodeling of areas occupied by these departments. I concur and recommend that the Comptroller and the Secretary of the Board be authorized to execute these contracts.

On motion of Mr. Grange, these contracts were awarded and the

Comptroller and the Secretary of the Board were authorized to execute the same.