BID SCHEDULE—REMOVAL OF EQUIPMENT FROM OLD POWER PLANT Note: All items are payment to the University except Section VII which is payment by the University.

National Power Machinery Co, Clonick Steel Co. Continental Chimney Co., Inc. Advance Steel Salvage Corp.

$3 225 oo 1

SECTION I.—BOILERS AND STOKERS: Boilers #i to #8, inclusive, with stokers SECTION II.—FANS: A. Two F. D. fans with motors AA. Two F. D. fans without motors B. Two new F. D. fane with motors , . ., BB. Two new F. D. fans without motora. C. Two I. D. fans without motors D. One I. D. fan without motor SECTION III.—TURBO-GENERATORS: A. One turbo-generator B. One turbo-generator D. One G. E. voltage regulator E. One Ward-Leonard voltage regulator F. Spare parts SECTION IV.—MOTORS: B. One Century 22-40 h.p. C. One Century 22-40 h.p. D. One Century 14-25 h.p. E. One Century 14-25 h.p. F. One Century 14-25 h.p. G. One Century 14*25 h.p. motor. motor. motor. motor. motor. motor.

A. Borinstein

. $1 525 oo 1

Fred L. Wright

Hopper Paper Co.

70 10 80 30 10 5 $2 100 oo 3 2 250 00 50 00 50 00 125 00

00 00 00 00 00 00

o >

375 00 375 00

850 00

150 00 250 00

S

ij H pa d

15 30 20 20 20 20

00 00 00 00 00 00

:::::::

3

w w

SECTION V.—COAL AND ASH CONVEYOR: A. Coal and ash conveyor < SECTION VI.—MISCELLANEOUS EQUIPMENT: A. One feed water heater B. One duplex water pump C. One simplex water pump / D. One centrifugal pump SECTION VII.—REMOVAL OF STACKS: Removal of two stacks SECTION V I I I — W A T E R TANKS: Two steel water tanks (in Fire Station). •Includes Bid V.

s

760 00

37 31 21 5* $15 250 00 £ 1 3 500 00

SO 50 50 SO $4. 800 00

14 190 00

S

to

Add 3150 if header piping south wall is included with boilers.

3

Combined bid only.