194l]

UNIVERSITY OF ILLINOIS (2) Provide IJ4" conduit from low Room No. 114-A to a 51 pair including cabinet and trim in accordance with estimate dated (3) Change electrical work in food required in connection with changed locations of equipment tations of March 19, 1940 Total Additional Cost tension terminal in telephone terminal, Room No. 121 in March 7, 1940. . . . service kitchens as revisions of and as covered by quo-

227

66 00

326 00 $423 50

Change Order No. 7, contract with Wadeford Electric Company for electrical work. (1) Provide electrical lighting for exterior south ground story entrance in accordance with quotation dated March 19, 1940 $355 00 (2) Provide three Bel-Sun-Lite fixtures No. 12321, for telephone booths in Room No. 113 as quoted in letter dated March 18, 1940 31 05 Total Additional Cost $386 05 Change O r d e r No. 17, contract with W a d e f o r d Electric Company for electrical work. (1) Connect food service equipment to electrical outlets $273 00 (2) Change electrical feed to broiler in first story service kitchen from three-phase to single-phase.. 27 42 Total Additional Cost $300 42

SUMMARY

Total additions Total deductions Net Additions

$2 121 84 61 00 $2 060 84

On motion of Mr. Karraker, the action of the President of the University in approving these change orders was approved and confirmed, by the following vote: Aye, Mr. Cleary, Mr. Fornof, Mrs. Grigsby, Mr. Jensen, Mr. Karraker, Mr. Livingston, Dr. Meyer, Mr. Wieland; no, none; absent, Mr. Adams, Mr. Davis, Mr. Green.

ACCEPTANCE OF ILLINI U N I O N BUILDING (15) A recommendation that the Board adopt the following resolution accepting the Illini Union Building from the contractors:

RESOLUTION APPROVING A L L CONTRACTS I N CONNECTION W I T H T H E PROJECT N O . I I I . 1745-F

Whereas, the following persons entered into signed contracts with the Board of Trustees of the University of Illinois as owners for various divisions of work entering into construction of the Illini Union Building on the University of Illinois campus in Urbana, to wit: Contract No. Contractor Work 1 E . H . DeAtley Concrete Heating Tunnel 2 Carson-Payson Company Diversion of Steam Piping 3 General Paving Company Diversion of Sanitary Sewers 4 Arthur W. Murray Company Diversion of Water Piping 5 Edward P. Allison Co., Inc Diversion of Electric Conduits 6 W. E. O'Neil Construction Co Excavating and Substructure Work 7 General Paving Company Construction of Storm Sewers 8 English Brothers General Work 9 Phillips, Getschow Company Heating, Ventilating, and Air Conditioning Work