120

BOARD OF TRUSTEES

[November

14

A D J U S T M E N T I N BUDGET O F T H E ATHLETIC ASSOCIATION (5) The Board of Directors of the Athletic Association has voted to assign $500 from unappropriated income of the Association for the development of plans for reconstructing the press box in the Stadium and requests approval of this by the Board of Trustees. I concur. O n m o t i o n of M r . Cleary, this a d j u s t m e n t w a s authorized.

CONTRACT C H A N G E ORDERS O N P . W . A . PROJECTS (6) A recommendation for the approval of Change Order No. 3 in the contract with King and Petry for the construction of walks and drives in the area of the Illini Union Building: Omit walk west of Natural History Building, impossible to install until after construction sheds are removed— Deduct $525 26 Omit asphalt spray on main entrance drive—Deduct 125 00 650 26 Additional costs on relocating forms west of Natural History Building 78 35 Net Credit $571 91

On motion of Mr. Cleary, these changes were authorized, by the following vote: Aye, Mr. Adams, Mr. Cleary, Mr. Jensen, Mr. Karraker, Dr. Meyer, Mrs. Plumb, Mr. Pogue, Mr. Wieland, Mr. Williamson; no, none; absent, Mr. Mayer, Mr. Stelle.

BIDS O N INSTALLATIONS I N M E N ' S RESIDENCE HALL ( I N U R B A N A ) A N D U N I O N B U I L D I N G I N CHICAGO (7) T h e Director of the Physical Plant Department submits the accompanying schedules of bids received on the elevator installation and the finish h a r d w a r e in the Men's Residence Hall at U r b a n a ; and the installation of soda fountain, compressors, coils, and shelving in the Union Building, Chicago. B I D SCHEDULE ELEVATOR I N M E N ' S RESIDENCE H A L L Alternate Alternate No. 3 No. 1 (Add) Bidders Base Bid (Add) J85 Otis Elevator Company, Springfield, 111 $2 938 *354 76 Montgomery Elevator Company, Moline, 111 3 076 75 Warner Elevator Mfg. Co., Cincinnati, Ohio 3 688 100 Alternate No. 1—In the event that a speed governor safety is added as specified. Alternate No. 2—In the event that bi-parting doors are changed to manually operated twu-speed doors as specified. BID SCHEDULE FINISH HARDWARE IN MEN'S RESIDENCE HALI. Alternate A Bidders Base Bid (Deduct) Sargent & Company, 150 N. Wacker Drive, Chicago. . . . . . . $8 467 00 $544 00 F. Meyer & Bro. Company, 1311-13 S. Adams St., Peoria. . . 8 500 00 547 00 Prairie States Hardware & Builders' Co., 505 N. Prairie St., Bloomington 8 576 00 640 80 H. Channon Company, 201 E. North Water St., Chicago. . . 8 716 89 400 00 Clark & Barlow Hardware Co., 123 W. Lake St., Chicago.. . 8 850 00 550 00 B. M. Dennis & Son, 611 N. Water St., Decatur 9 290 00 693 00 Holder Hardware Co., Inc., 105-7 North East St., Bloomington 9 989 00 600 00 Midwest Hardware Co., 172 North Wacker Drive, Chicago... 10 295 00 623 00 Morehouse St. Wells Co., 805 N. Morgan St., Decatur ri 670 87 795 59 Alternate A—In the event that all dead locks, including knobs, strikes, and thumb turns room closets are omitted. Alternate B—In the event that 6 stainless steel kick plates are omitted. Alternate B (Deduct)

$130 00

130 00 52 00 105 00 n o 00 n o 00 108 00 220 00 211 68 for student