UIHistories Project: A History of the University of Illinois by Kalev Leetaru
N A V I G A T I O N D I G I T A L L I B R A R Y
Bookmark and Share



Repository: UIHistories Project: Board of Trustees Minutes - 1964 [PAGE 61]

Caption: Board of Trustees Minutes - 1964
This is a reduced-resolution page image for fast online browsing.


Jump to Page:
< Previous Page [Displaying Page 61 of 1633] Next Page >
[VIEW ALL PAGE THUMBNAILS]




EXTRACTED TEXT FROM PAGE:



16

BOARD OF TRUSTEES

[Juty

18

CONTRACTS FOR CONSTRUCTION OF ADDITION TO THE LIBRARY (18) The Director of the Physical Plant and the Vice-President and Comptroller recommend award of the following contracts for construction of the seventh addition to the Library, the award in each case being to the lowest bidder: General — Pathman Construction Co., Chicago $496 880 Base bid $440 880 Additive alternate to relocate Library tennis courts. 47 500 Additive alternate for service charge for supervision of other prime contracts assigned to general contractor 8 500 Electrical — Square Deal Electrical Contracting, Inc., Urbana $ 81 140 Base bid $ 67 663 Additive alternate to relocate Library tennis courts 13 477 Plumbing — George S. Walker Plumbing and Heating, Inc., Decatur 55 660 Base bid $ 47 360 Additive alternate to relocate Library tennis courts 8 300 Heating, Refrigeration, and Temperature Control — R. H . Bishop Company, Champaign 84 743 Ventilating — F. R. Inskip and Company, Champaign 69 940 Elevator — Otis Elevator Company, Chicago 24 469 Total Contracts $812 832 It is further recommended that all contracts other than the general contract be assigned to the contractor for general work, making the total of his contract price $812,832. It is further recommended that an agreement be entered into with the Pathman Construction Company for the assignment of these other contracts for $8,500, which amount is included in the contract price, being the amount bid by that Company for service charge for supervision of other contracts assigned to the general contractor. Funds are available from state capital appropriations to the University for 1961-63 from the Universities Building Fund and have been released. Submitted herewith is a report from the Physical Plant Department on this project, including a schedule of bids received, a copy of which is being filed with the Secretary of the Board for record. I concur. O n m o t i o n of M r . J o h n s t o n , t h e s e c o n t r a c t s w e r e a w a r d e d , a s r e c ommended, by the following vote: Aye, M r . Clement, M r . Dilliard, Mr. Hughes, Mr. Johnston, Mr. Pogue, Mrs. Watkins, Mr. Wilkins, M r . Williamson; no, n o n e ; absent, M r . H a r e w o o d , M r . K e r n e r , M r .

Swain.

CONTRACT FOR CONSTRUCTION OF ADDITIONAL SPACE IN THE ARMORY (19) The Director of the Physical Plant and the Vice-President and Comptroller recommend awards of the following contracts, subject to the release of funds, for the construction of a four-story addition at the west end and a balcony on the north and south sides of the interior of the Armory, the award in each case being to the lowest bidder: General — Pathman Construction Co., Chicago $421 992 Base bid . $418 539 Additive alternates for vinyl asbestos tile and gypsum plaster surfacing on concrete block walls 3 453 Plumbing — George S. Walker Plumbing and Heating, Inc., Decatur 36 700 Electrical — Downtown Electric Company, Urbana 96 325 Heating, Refrigeration, and Temperature Control — Ideal Heating Company, Chicago 139 777 Ventilating— R. H . Bishop Company, Champaign 26 774 Elevator — Otis Elevator Company, Chicago 27 287 Total Contracts : $748 855 Funds are available in the state capital appropriations to the University for 1961-63 from the Universities Building Fund, subject to release.